MPERC · Madhya Pradesh Electricity Regulatory Commission
Transmission Tariff (Revision-IV) Regulations, 2020 — First Amendment, 2023
First amendment to Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Transmission Tariff) (Revision-IV) Regulations, 2020 {ARG-28 (IV) (i) of 2023}
AmendmentDated 23 Jan 2023No. MPERC/2023/214. dated 23rd January 2023
Replaced by Terms and Conditions for Determination of Transmission Tariff (Revision-V) Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Transmission Tariff (Revision-IV) Regulations, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This two-page instrument is the Commission's first amendment to its 2020 transmission tariff regulations. Regulation 1 supplies the short title, brings the amendment into force from the date of publication in the official Gazette — no Gazette date is printed — and extends it to the whole of Madhya Pradesh (p1–2).
Regulation 2 substitutes Regulation 2 of the Principal Regulations, so that transmission tariff determination under Section 62 applies only where transmission system capacity has been allotted under the MPERC Intra-State Open Access Regulations, 2005 (p2). A proviso carves out new intra-state transmission projects above a cost threshold: their tariff must go through transparent bidding and be adopted under Section 63 after prudence check, following Ministry of Power guidelines (p2). A closing note records the Principal Regulations' Gazette publication date of 14 February 2020 (p2).
Read with this
The regulation
- Dated 6 Feb 2020Transmission Tariff (Revision-IV) Regulations, 2020
4 more documents belong here and are not on Voltaic: 4 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.