Summary
Summary written by software. Check the regulator's original before you rely on it.
The Bihar Electricity Regulatory Commission's (Intra-state Availability Based Tariff and Deviation Settlement Mechanism) Regulations, 2020 — notification No. BERC-SMP-17/2019-02 dated 2 June 2020, published in the Bihar Gazette on 3 June 2020 (p1) — build the state's ABT and deviation-settlement regime for everything scheduled and energy-accounted by SLDC. They apply across Bihar to "Intra-State Entities" (p2), but commencement is deferred: regulation 2.3 leaves the start date to a separate Commission notification (p2).
Chapter I (p1–4) sets the policy basis — the National Electricity Policy and Tariff Policy intentions, and CERC's 2014 DSM Regulations as the template — and defines some forty-five terms, including the RE-specific "Absolute Error" and "Available Capacity", the power-exchange "Area Clearing Price", and the pooled QCA role for wind and solar generators sharing a pooling station.
Chapter II is operative. Regulation 4 splits ABT tariffs into capacity, energy and deviation components and refers computation of the first two to the BERC tariff regulations (p4). Regulation 5 lists the conditions for participating in DSM — non-discrimination, disclosure of contracts, binding SLDC despatch instructions, grid-code compliance, TSAs/connection agreements and 15-minute metering (p5). Regulation 6 fixes applicability by category: state generating stations, conventional and captive plants, RE plants above a capacity threshold, short-term sellers, DISCOMs drawing through the state grid, and consumers/captive users (p5–6).
Regulations 7 and 8 are the core: basic deviation charges at CERC rates with dead bands, separate treatment of wind and solar deviations inside and outside a band, a cap on deviation charges, volume limits tied to grid frequency, additional charges for crossing them, and a sign-change obligation whose regime differs before and after 1 April 2020 (p6–12). Regulations 9–12 cover scheduling and despatch, anti-gaming, drawal-point settlement for open access consumers (including small solar and wind), and the weekly State DSM Account with its pool, payment timelines, interest, letters of credit and surplus fund (p12–16). Regulations 13–15 are residual powers. Schedule-A (p17–18) and Annexures I–II (p19–21) carry the rate vector, computation methodology and illustration.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.