Summary
Summary written by software. Check the regulator's original before you rely on it.
BERC's Deviation Settlement Mechanism Regulations, 2025 are the intra-state commercial mechanism that makes grid users in Bihar stick to their schedules. The notification is dated 9 January 2026 and was published in the Bihar gazette extraordinary on 12 February 2026 (p1), but the regulations do not operate until 1 June 2026, and the Commission may notify a different date (p1). Regulation 21 repeals the Commission's 2020 Intra-State ABT and DSM Regulations from that commencement date (p12).
Regulation 4 brings in all grid-connected State Entities — distribution and deemed distribution licensees, and partial and full open access consumers on the intra-state transmission system — with a proviso extending scope to RE generating stations on the InSTS having exportable capacity of 1 MW or more (p4–5). Regulations 5–6 set the obligation not to deviate and the preconditions for participation: disclosure of contracts and contract rates, connection/open access agreements, AMR metering at 15-minute intervals synchronised by GPS, and binding SLDC despatch instructions (p5).
The pricing machinery is the core. Regulation 7 gives separate deviation formulae in MWh and percent for general sellers, wind/solar (WS) sellers — indexed to available capacity — and buyers (p6). Regulation 8 derives the Normal Rate as the highest of DAM Area Clearing Price, Real Time Market ACP, or a one-third blend of DAM, RTM and ancillary service charge, with a fallback day when ACP is missing (p6). Regulation 9 is the rate matrix: frequency-linked charges for general sellers, frequency-independent treatment for run-of-river hydro, MSW, WS sellers and storage, volume-limit slabs for buyers and WS sellers, and special cases for standalone ESS, RE-plus-storage, infirm power, pre-COD start-up power, forced outage and HP-DAM sales (p6–10).
Regulations 10–13 establish the SLDC-operated State Deviation Pool Account, its credits and charges, shortfall recovery through supplementary bills and 50:50 use of quarterly surplus, the monthly accounting procedure due within 30 days and Commission approval, payment within 10 days with late payment surcharge and Letter of Credit rules, and reactive energy settlement (p10–11). Regulations 14–15 cover SLDC instructions and QCA accounting and de-pooling duties (p11–12); Regulations 16–20 give the Commission waiver, relaxation, amendment, difficulty-removal and final-interpretation powers (p12).
Read with this
Commencement notices and reasons
Procedures and orders made under it
Earlier drafts
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.