HERC · Haryana Electricity Regulatory Commission

Grant of Connectivity and Open Access for Intra-State Transmission and Distribution System, 2012 — 1st Amendment, 2013

Haryana Electricity Regulatory Commission (Terms and Conditions for grant of connectivity and open access for intra-State transmission and distribution system) (1stAmendment) Regulations, 2013

AmendmentDated 3 Dec 2013Regulation No. HERC/ 25 / 2012 / 1 st Amendment / 2013 dated The 3 rd December, 2013

Amends the Terms and Conditions for Grant of Connectivity and Open Access for Intra-State Transmission and Distribution System, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Notification dated 3 December 2013 issues the first amendment to HERC’s 2012 open access regulations (p1). Pages 1-9 are a Statement of Objects and Reasons: it recounts growth in open access, summarises stakeholder consultation and hearings, and explains the major changes. It records that contract-demand eligibility is being lowered to 0.5 MVA for consumers and explains a group/single-point route for lower-demand and LT industrial consumers fed from one feeder; it also explains new minimum scheduling quanta by contract-demand slab. It discusses compensation for under-drawl, distinguishing consumer-controlled causes, force majeure and licensee system failure; peak load exemption charges on open-access drawl beyond the normal exemption limit; day-ahead scheduling conditions so licensees can plan; and demand surcharge when total drawl exceeds contract demand.

Pages 10-34 contain the operative amendments. Clause 1 gives short title, Gazette-publication commencement and statewide extent. Clause 2 rewrites scope to cover connectivity and long/medium/short-term open access, including no-objection/standing clearance for inter-state use. Clause 3 adds definitions for beneficiary, bilateral transaction, collective transaction and power exchange. Clause 4 deals with application forms, procedure copies and website hosting. Clause 5 rewrites entitlement and conditions, including capacity thresholds, group applications, feeder and metering conditions, and disqualifications for insolvency, dues or theft proceedings. Clause 6 sets processing timelines and makes STU Panchkula the nodal agency, with an online-acceptance target. Clauses 7-9 cover inter-state procedure, short-term first-come-first-served processing and consent/deemed-consent by STU or distribution licensee. Clause 10 prescribes transmission and wheeling charge recovery and sharing, including dedicated systems. Clause 11 recasts imbalance charges for over/under drawl and injection, with force majeure and licensee-breakdown treatments. Clauses 12-14 add day-ahead scheduling, admissible drawl, settlement and telescopic PLEC rules for embedded consumers. Clause 15 requires SEM/ABT metering and clause 16 relaxes cancellation/revision of short-term schedules.

Standard name
Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document