HERC · Haryana Electricity Regulatory Commission
Grant of Connectivity and Open Access for Intra-State Transmission and Distribution System, 2012 — 1st Amendment, 2013
Haryana Electricity Regulatory Commission (Terms and Conditions for grant of connectivity and open access for intra-State transmission and distribution system) (1stAmendment) Regulations, 2013
AmendmentDated 3 Dec 2013Regulation No. HERC/ 25 / 2012 / 1 st Amendment / 2013 dated The 3 rd December, 2013
Summary
Summary written by software. Check the regulator's original before you rely on it.
Notification dated 3 December 2013 issues the first amendment to HERC’s 2012 open access regulations (p1). Pages 1-9 are a Statement of Objects and Reasons: it recounts growth in open access, summarises stakeholder consultation and hearings, and explains the major changes. It records that contract-demand eligibility is being lowered to 0.5 MVA for consumers and explains a group/single-point route for lower-demand and LT industrial consumers fed from one feeder; it also explains new minimum scheduling quanta by contract-demand slab. It discusses compensation for under-drawl, distinguishing consumer-controlled causes, force majeure and licensee system failure; peak load exemption charges on open-access drawl beyond the normal exemption limit; day-ahead scheduling conditions so licensees can plan; and demand surcharge when total drawl exceeds contract demand.
Pages 10-34 contain the operative amendments. Clause 1 gives short title, Gazette-publication commencement and statewide extent. Clause 2 rewrites scope to cover connectivity and long/medium/short-term open access, including no-objection/standing clearance for inter-state use. Clause 3 adds definitions for beneficiary, bilateral transaction, collective transaction and power exchange. Clause 4 deals with application forms, procedure copies and website hosting. Clause 5 rewrites entitlement and conditions, including capacity thresholds, group applications, feeder and metering conditions, and disqualifications for insolvency, dues or theft proceedings. Clause 6 sets processing timelines and makes STU Panchkula the nodal agency, with an online-acceptance target. Clauses 7-9 cover inter-state procedure, short-term first-come-first-served processing and consent/deemed-consent by STU or distribution licensee. Clause 10 prescribes transmission and wheeling charge recovery and sharing, including dedicated systems. Clause 11 recasts imbalance charges for over/under drawl and injection, with force majeure and licensee-breakdown treatments. Clauses 12-14 add day-ahead scheduling, admissible drawl, settlement and telescopic PLEC rules for embedded consumers. Clause 15 requires SEM/ABT metering and clause 16 relaxes cancellation/revision of short-term schedules.
Read with this
The regulation