Terms and Conditions for Grant of Connectivity and Open Access for Intra-State Transmission and Distribution System, 2012

Haryana Electricity Regulatory Commission (Terms and conditions for grant of connectivity and open access for intra-State transmission and distribution system) Regulations, 2012

RegulationDated 11 Jan 2012HERC / 25 / 2012 dated The 11th January, 2012

1 amendment to it is on Voltaic, dated 3 Dec 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software, from pages 1 to 31 of 41. Check the regulator's original before you rely on it.

The HERC notification dated 11 January 2012 (p1) frames the Haryana Electricity Regulatory Commission (Terms and conditions for grant of connectivity and open access for intra-State transmission and distribution system) Regulations, 2012, under section 181 of the Electricity Act 2003. They extend to the whole State and take effect from Gazette notification; the Gazette date is not printed (p1). Chapter I sets scope: they apply to applications for connectivity to, and long-term, medium-term or short-term open access on, the intra-State transmission and/or distribution system, including use with inter-State transmission; connectivity is a precondition for open access though simultaneous applications are allowed (p1–2).

Chapter II (p2–5) defines core vocabulary — connectivity, connection agreement, open access, embedded and limited short-term open access consumers, long/medium/short-term open access, nodal agency, stranded transmission/distribution capacity and interface metering. Chapter III (p5–6) requires the STU to set up a coordination committee with distribution, transmission and SLDC nominees, and to have the committee frame rules and a detailed procedure for Commission approval; the existing procedure continues until then. Chapter IV (p6–9) governs grant of connectivity: eligibility at stated load/capacity thresholds and voltage levels — consumers or generators of 10 MW and above at 33 kV or above, and below that at 33 kV or below — nodal agency arrangements, application contents and fees, feasibility study, disposal timeline, connectivity offer, connection/tripartite agreements, infirm power injection before commercial operation and exit/relinquishment.

Chapter V (p9–22) is the open-access core: system considerations and capacity-availability methodology; eligibility, including licensees, generators, captive plants and consumers meeting demand/voltage/feeder conditions; special provisions for existing distribution licensees, consumers, generators and BBMB supply; categories of open access; application procedure and nodal agency; inter-State procedures by reference to CERC regulations; long-term, medium-term, short-term and day-ahead/bidding procedures; consent timelines and deemed consent; and treatment of defaulters. Chapter VI (p23–30) covers allotment priority and open access charges: transmission and wheeling charges, SLDC/RLDC scheduling charges, cross-subsidy surcharge, additional surcharge, standby power charges and imbalance charges with settlement through a State Imbalance Pool Account and interest on delayed payment. Chapter VII (p30–31) deals with scheduling, metering by special energy meters and bearing of transmission/distribution losses. Chapter IX (p31) begins commercial matters — billing, collection and disbursement for inter-State and intra-State transactions. Pages 32–41 are not available.

Standard name
Open Access Regulations, Connectivity and GNA Regulations
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.