Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2026

Kerala State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2026

RegulationDated 11 Mar 2026No. 3476/Con(T2)/2026/KSERC dated 11th March, 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KSERC Notification No. 3476/Con(T2)/2026/KSERC dated 11 March 2026 publishes the Kerala State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2026, made under s.181 read with ss.61, 66 and 86 of the Electricity Act 2003 (p1–2). They extend to the whole State and take effect from Gazette notification (p2). The preamble and explanatory note (pp30–31) present them as Kerala's discharge of Rule 16(2) of the Centre's Electricity (Amendment) Rules 2022, following the June 2023 Resource Adequacy Guidelines and the Forum of Regulators' model regulations, and as the planning backbone for the State's stated goal of 100% renewable energy by 2040 (p1–2).

Chapter 1 sets objective, scope and definitions (pp2–5). The Regulations bind generating companies, distribution licensees, the SLDC, the STU and other grid-connected entities in Kerala, with a proviso exempting distribution licensees that procure bulk power only from a seller licensee from separate RA obligations, though they must still furnish data (p2–3). Definitions fix the long- and short-term planning horizons, capacity credit, planning reserve margin, reliability metrics and contract tenure bands (pp3–5). Chapter 2 lays out the four-step framework — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — and assigns LT-DRAP to the distribution licensee and ST-DRAP to the SLDC (pp5–6).

Chapter 3 governs demand assessment: category-wise and hourly/sub-hourly forecasting, permitted methods, scenario analysis, loss trajectory and derivation of peak demand, with forecasts to SLDC by 30 April and SLDC aggregation to CEA/NLDC/RLDC and the Commission by 31 May each year (pp6–9). Chapter 4 covers generation resource planning: data inputs, hourly chronological optimisation with stated constraints (resource adequacy requirement, portfolio balance, RE, conventional, RPO, storage, operating reserve, demand response, T&D), capacity-crediting methods and their application to RE, hydro, thermal and storage, the interface with CEA's LT-NRAP and NLDC's ST-NRAP, the annual vetting-and-approval chain, and the LOLP/NENS study used to arrive at optimal planning reserve margins (pp9–22).

Chapter 5 sets procurement planning — least-cost modelling, permitted procurement routes, indicative lead times, prior Commission approval of PPAs/PSAs and deviations under the 2021 Tariff Regulations (pp22–25). Chapters 6–8 cover quarterly compliance and non-compliance charges, data sharing, website disclosure, a dedicated RA cell, the annual milestone calendar, and the Commission's powers to direct, relax, amend and remove difficulties (pp25–29).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Renewable purchase obligation (RPO / RCO)

Read with this

Other copies of these documents (1)

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document