Delhi Green Energy Open Access Regulations, 2024

Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024

RegulationDated 12 Nov 2024F. 17(17)/Engg./DERC/2023-24/C.F.No.8020/1568 dated 12th November, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Delhi Electricity Regulatory Commission's principal regulation for green energy open access, notified in Delhi on 12 November 2024 and made under Section 181 read with Sections 42, 61(h), 66 and 86(1)(e) of the Electricity Act, 2003 (p21). It extends to the whole of NCT of Delhi and comes into force on gazette publication (p21).

The opening regulations give definitions and interpretation rules, then set the scope: open access to electricity from green energy sources and from non-fossil-fuel municipal solid waste-to-energy and refuse-derived fuel plants, using the intra-State transmission and distribution systems, including assets incidental to inter-State transmission (p23). Eligibility is fixed for consumers with contract demand or sanctioned load of 100 kW or more, single or aggregated across connections, connected at 11 kV or above in the area of one distribution licensee; captive generating plants face no load limitation (p24–25).

The core machinery is procedural. Applications go through the Central Nodal Agency to the State Nodal Agency, which must decide within 15 days; a detailed timeline table runs from T0 (acknowledgement) to T0+15 working days (p25–28). It specifies processing fees by access term, bank guarantees for long/medium-term applications, day-ahead transaction approval windows and fees, and cancellation for failure to commission (p28–30).

The charge regime lists the heads payable — transmission, wheeling, cross-subsidy surcharge, additional surcharge, standby, banking, SLDC/scheduling/DSM and other charges, relinquishment — and leaves the rates to the Commission's tariff orders and separate orders, while specifying the exemptions and caps that apply (p30–33). Sub-sections 13.1 to 13.8 detail each head and the relinquishment compensation framework by access term (p30–35).

The final regulations specify curtailment priority (green energy curtailed after ordinary open access within each term category), metering standards by connection size, grid-code compliance, collection and disbursement through the State Nodal Agency, SLDC information reporting, quarterly licensee reports, grievance handling by the Nodal Agency with appeal to the Commission within 30 days, and powers to relax, amend and remove difficulties (p35–36). Regulation 26 repeals inconsistent earlier orders and notifications while preserving existing granted open access for the term already agreed (p36).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Open access charges

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.