DERC · Delhi Electricity Regulatory Commission
Draft Terms and Conditions for Green Energy Open Access Regulations, 2024
Draft Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024
Draft regulationDated 7 Jun 2024F. 17(17)/Engg./DERC/2023-24//8020 dated 07.06. 2024
Draft
A proposal that has since been finalised as the Delhi Green Energy Open Access Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Notification F.17(17)/Engg./DERC/2023-24//8020, dated 07.06.2024, issues draft Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024 for the National Capital Territory of Delhi (p1). It is made under the Electricity Act, 2003, s.181 read with ss.42, 61(h), 66 and 86(1)(e), and aims to provide non-discriminatory open access to intra-state transmission and/or distribution systems for green energy, including charges and banking (p1).
Regulations 1–2 set title, extent, commencement from publication and objective (p1). Regulation 3 defines Act, applicant, banking, captive generating plant, central and state nodal agencies, green energy, green energy open access consumer, open access, standby and wheeling; Regulation 4 gives interpretation rules (p1–4). Applicability extends to green energy sources including non-fossil municipal solid waste-to-energy (p5). Regulation 6 sets criteria for allowing long-term and short/medium-term access, metering and no-dues conditions; Regulation 7 categorises long-term, medium-term and short-term access by duration (p5).
Regulations 8–9 set application procedure and eligibility: consumers with contracted demand or sanctioned load of Hundred (100) kW or more, single or multiple connections aggregating in the same division, with no capacity limit for captive use (p1, p3, p6). Regulation 10 designates the Central Nodal Agency portal, SLDC as State Nodal Agency for short-term, STU for medium/long-term, and distribution licensee for distribution-network cases (p7). Regulation 11 sets allotment priority; Regulation 12 gives the grant procedure and a time schedule table (p7–12). Regulation 13 covers day-ahead green energy open access transactions (p14).
Regulation 15 is the core charges chapter: transmission, wheeling, cross-subsidy surcharge, additional surcharge, standby charges, banking, energy settlement, SLDC/scheduling/DSM fees, payment security and relinquishment compensation (p14–21). Regulations 16–19 cover curtailment priority, dispute resolution before the SNA with appeal to the Commission, metering (ABT/Special Energy Meters) and reactive energy charges (p21–22). Regulations 20–23 require grid code compliance, charge collection and disbursement, SLDC information posting and licensee monthly reports (p22–23). Regulations 24–30 give the Commission powers to issue directions, relax, amend, remove difficulties, and contain savings for existing open access and a repeal savings clause (p23–24).
Read with this
The regulation
- Dated 12 Nov 2024Delhi Green Energy Open Access Regulations, 2024
Earlier drafts
- Dated 7 Jun 2024Public notice: Terms and Conditions for Green Energy Open Access Regulations, 2024 — Draft — Public Notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.