Skip to content

KERC · Karnataka Electricity Regulatory Commission

Forecasting, Scheduling and DSM for Wind, Solar and RE-Hybrid Sellers and Buyers Regulations, 2025 — Draft

Karnataka Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters for Sellers and Buyers of Wind, Solar and RE-Hybrid Generation sources) Regulations, 2025

Draft regulationDated 10 Dec 2025KERC/WS(DSM) /2025-26/1299 dated 10.12.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft KERC notification dated 10 December 2025 proposing new regulations for forecasting, scheduling and deviation settlement for sellers and buyers of wind, solar and wind-solar hybrid generation, including storage. Comments are invited by 13 January 2026 (p1–3). The regulations would commence on Karnataka Gazette publication and would repeal the 2015 Wind and Solar Forecasting/Scheduling/DSM Regulations, with savings for actions already taken (p3, p15–16).

The preamble explains the trigger: KEGC 2025, notified on 21 July 2025, changes scheduling and applicability for wind-solar sources; the Intra-State DSM Regulations 2025, notified 22 July 2025, cover other RE stations above 5 MW but exclude wind, solar and WS hybrid. KERC therefore proposes a dedicated WS regime, citing forecast error, hybrid/ESS integration and gaming concerns (p1–2).

The operative draft (pp3–16) sets objectives, definitions, applicability by contracted capacity at the pooling station or interface point, and duties aligned to KEGC 2025. Its central compliance model is the QCA: sellers and buyers may act through a registered QCA or use SLDC forecasting services; multiple QCAs at one pooling station are barred; SLDC must propose registration procedure, criteria and fee within 60 days for approval (p6–8). It specifies week-ahead, day-ahead 96-block and intra-day forecasts, SLDC’s own forecasting option, aggregation of pooling stations, RE priority in despatch, metering, telemetry, communication and CEA technical standards (p8–11).

The DSM chapter is the core: it gives error formulas for sellers and buyers, sets technology-specific tolerance bands and deviation charge slabs, creates a monthly State Deviation Pool Account maintained by SLDC, and addresses curtailment exemptions, payment timelines, interest, registration revocation and use of the deviation fund (p11–15). The draft ends with relax/amend powers, repeal and savings, removal of difficulties, final interpretation by the Commission, and a gaming inquiry/disallowance procedure (p15–16).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document