CERC · Central Electricity Regulatory Commission

RLDC Fees and Charges Regulations, 2015

Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2015

RegulationDated 18 May 2015No. L-1/153/2014/CERC dated 18th May, 2015

Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 77 of 116. Check the regulator's original before you rely on it.

This is the CERC regulation that governs how Regional Load Despatch Centres, the National Load Despatch Centre and POSOCO recover their costs from grid users during the 2014-19 control period. The notification opens at p1 with commencement and a control period running from 1.4.2014 to 31.3.2019, unless the Commission reviews or extends it earlier. Chapter 1 pp1-8 sets scope and definitions, including who counts as a user and how stages, regions, foreign interconnections, Sardar Sarovar Project and BBMB are treated.

Chapter 2 pp9-12 deals with registration with RLDCs or NLDC for grid access and scheduling, and with the CAPEX/REPEX plan that POSOCO must formulate and submit. Chapter 3 pp13-22 sets the application process for determination of fees and charges, public notice and scrutiny, annual and control-period truing up, computation of capital cost, additional capitalisation and de-capitalisation, debt-equity treatment, and the Load Despatch Centre Development Fund. Chapter 4 pp23-24 fixes the structure of RLDC fees and charges, the components of annual charges, and their split between system operation and market operation functions.

Chapter 5 pp25-32 gives the methodology for annual charges: return on equity, interest on loan capital, depreciation, O&M expenses, human resource expenses, interest on working capital, NLDC and corporate office expenses, and contingency expenses. Chapter 6 pp33-37 specifies registration fees, formulas for system operation charges across transmission licensees, generating stations, sellers, distribution licensees and buyers, formulas for market operation charges, and the option for SLDCs to collect on mutual agreement. Chapter 7 pp38-39 provides performance-linked and certification-linked incentives. Chapter 8 pp40-41 covers billing, late payment surcharge, hedging/FERV recovery, rebate, power to relax and removal of difficulty.

Appendix I begins at p42 and contains the tariff filing form index and Forms 1 through 5D, covering summary sheets, normative parameters, capital cost, additional capitalisation, financing, foreign equity and loans, and interest on loans.

Primary topics
SLDC and RLDC fees and charges, ARR and true-up, Return, financing and working capital

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document