Skip to content

CERC · Central Electricity Regulatory Commission

Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019

Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019

RegulationDated 5 Apr 2019No.L-1/153/2019/CERC

Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 41 of 64. Check the regulator's original before you rely on it.

CERC issued these regulations on 5 April 2019 under s.178 read with s.28(4) of the Electricity Act 2003, to govern fees and charges collected by Regional Load Despatch Centres and the National Load Despatch Centre over the control period 1.4.2019–31.3.2024 (p1). They apply to generating companies, distribution licensees, inter-State transmission licensees, buyers, sellers, inter-State trading licensees, power exchanges and other users of NLDC/RLDC services (p1, p6). The regulations take effect from Gazette publication, but the Gazette date is not printed; the notification is dated 5 April 2019 (p1).

Chapter 1 defines key terms and fixes the scope and control period (pp1–5). Chapter 2 covers registration for grid access and scheduling, sets out the functions of RLDCs/NLDC across logistics, market operation, registry (REC/PAT) and system operation, identifies who counts as a user, and requires CAPEX/REPEX and OPEX plans to be approved by POSOCO's Board (pp6–12). Chapter 3 lays down the petition route for determination of fees and charges, prudence check and truing up; RLDCs/NLDC must apply in the prescribed format, serve users and publish newspaper notices, and may continue billing on earlier approved charges during pendency (pp13–15).

Chapter 4 governs computation of capital cost, additional capitalisation/de-capitalisation and debt-equity treatment (pp16–17). Chapter 5 lists the components of RLDC fees and charges and Annual LDC Charges (p18). Chapter 6 gives the methodology for each component: return on equity, interest on loan, depreciation, O&M, OPEX, human resource expenses, interest on working capital and NLDC/corporate office expenses, with truing-up provisions (pp19–23). Chapter 7 creates the LDC Development Fund and Contingency Reserve and specifies their uses (pp24–25). Chapter 8 prescribes registration fees by user category and formulas for monthly LDC charges, collected through SLDCs where applicable (pp26–28). Chapter 9 establishes performance-linked incentives tied to KPIs in Appendix V and certification retainer-ship for certified LDC personnel (pp29–30). Chapter 10 covers billing, late payment surcharge, rebates, hedging/FERV recovery, dispute resolution and removal of difficulty (pp31–32). Appendix I contains the tariff filing forms for NLDC/RLDCs; Appendices II–V are referenced but not included in this partial text.

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Tariff determination, Return, financing and working capital

Read with this

Commencement notices and reasons

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document