Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Generation Tariff (Second Amendment) Regulations, 2020

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) (Second Amendment) Regulations, 2020 {ARG-26 (IV) (ii) of 2023}

AmendmentDated 21 Feb 2023No. 394/MPERC/2023 dated 21th February 2023

Replaced by Generation Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MPERC's Second Amendment to its Generation Tariff Regulations, 2020, issued at Bhopal on 21 February 2023 (p1), rewrites cost recovery for emission control systems fitted to coal-based thermal generating stations. It inserts new definitions — auxiliary energy consumption for the emission control system, 'Emission Control System', and 'Date of Operation' (ODe), the last certified through a management certificate signed at Director level — and amends the Plant Load Factor and Plant Availability Factor formulae to net out emission-control auxiliary consumption (p1–3, p8).

The operative core creates a parallel 'supplementary' tariff stream: supplementary capacity charges (a new Regulation 42A with season-wise, peak and off-peak month-by-month formulae built on annual fixed cost of the emission control system, achieved and normative plant availability) and supplementary energy charges covering differential energy charges and reagent cost (p8–13). Related amendments touch capital cost heads (including biomass co-firing), interest during construction, initial spares, additional capitalisation, a distinct return-on-equity basis for emission control assets, interest on loan, depreciation schedules keyed to the station's age, working capital norms, O&M expenses for emission control systems, water consumption norms, energy-charge recovery, and fly ash utilisation expenses (p3–17).

Regulation 49 gains normative auxiliary energy consumption ceilings by FGD and DeNOx technology, plus normative reagent consumption formulae for limestone, lime, sodium bicarbonate, urea and ammonia, with an uplift where a gas-to-gas heater is installed (p14–16). Annexure-I Part 1 adds FORM 15A (reagent details for supplementary energy charge) and FORM 19A (fly ash transport and utilisation) (p18–19). It commences on Gazette publication; the Gazette date is not printed (p1).

Standard name
Generation Tariff Regulations
Primary topics
Emission control costs, Generation tariff, Tariff determination

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document