WBERC · West Bengal Electricity Regulatory Commission
West Bengal Ancillary Services Regulations, 2023 — Draft
West Bengal Electricity Regulatory Commission (Ancillary Services) Regulations, 2023
Draft regulationDated 22 Mar 2023WBERC/Regulation-74/22-23/ 3642 dated 22nd March, 2023
Draft
A proposal that has since been finalised as the Ancillary Services Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a consultation package from the West Bengal Electricity Regulatory Commission: a public notice dated 22 March 2023 invites objections, suggestions and comments by 13 April 2023 on a draft set of ancillary-services regulations (p1). The draft text follows at pp2–13. It is made under section 181 of the Electricity Act 2003 and is to commence on a date the Commission later notifies; the draft notification is undated and carries a placeholder number (p2).
The draft creates a state-level framework for procuring, deploying and paying for ancillary services, with the State Load Despatch Centre as Nodal Agency. Regulations 1–6 set the objective, definitions, scope, service categories and reserve estimation. The objective is to minimise state deviation, help SLDC keep frequency close to the target and relieve intra-state congestion (p2). The scope covers intra-state entities, including energy storage and demand-response resources (p5). The services listed are PRAS, SRAS, TRAS and any others in the Grid Code, but the operative mechanism is only for SRAS (p5–6). SLDC must estimate SRAS requirements and publish them day-ahead and update in real time (p6).
Part I (Regulations 7–13) is the SRAS rulebook. It sets eligibility for SRAS providers — generators, storage and demand-response entities, singly or aggregated, connected to the intra-state transmission system — including communications, AGC, metering and response conditions (p6). It defines when SRAS is activated using Area Control Error, sets the ACE formula and control modes, and leaves frequency-bias and offset values to the Nodal Agency (p6–7). Procurement is through standing consent, technical declarations and monthly energy/compensation charge declarations; Section 62 generators are identified day-ahead from un-requisitioned capacity and in real time after gate closure (p7–8). Selection is by merit order, despatch is by secondary control signal, and settlement is on defined time blocks (p9). Payment and payback flow through the state deviation fund; no incentive is given at the introductory stage (p9–10). Performance is monitored from SCADA data, with disqualification for persistent underperformance (p10–11).
Part II (Regulation 14) treats shortfall or emergency conditions: Section 62 generating stations, including those with un-requisitioned surplus, are deemed available to the Nodal Agency, with payment or payback for SRAS-Up or SRAS-Down (p11). Part III (Regulations 15–16) covers weekly accounting and settlement, the deviation formula, charges and credits to the fund, and exemption from transmission charges and losses for SRAS (p11–12). The draft then jumps from Part III to Part V; no Part IV appears in the text (p11–12). Part V (Regulations 17–19) requires the Nodal Agency to issue a Detailed Procedure within a set period after notification and lists its contents, and gives the Commission power to relax provisions and issue directions (p12–13).
Read with this
The regulation
- Dated 26 Dec 2023Ancillary Services Regulations, 2023
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.