WBERC · West Bengal Electricity Regulatory Commission

Ancillary Services Regulations, 2023

West Bengal Electricity Regulatory Commission (Ancillary Services) Regulations, 2023

RegulationDated 26 Dec 2023Published in the Gazette 26 Dec 2023No. 78/WBERC dated 26.12.2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The West Bengal Electricity Regulatory Commission (Ancillary Services) Regulations, 2023 (Notification No. 78/WBERC, dated 26.12.2023) create the state-level framework for procuring, deploying and paying for intra-state ancillary services. They take effect only from a date to be notified by the Commission, not from the Gazette date (p1).

Regulations 1–6 state the objective — minimising state deviation, helping SLDC keep frequency close to 50 Hz and relieving intra-state transmission congestion — and define the ancillary service categories PRAS, SRAS and TRAS. Only the SRAS procurement, deployment and payment mechanism is detailed here; SLDC estimates reserve requirements and publishes them (pp1–3).

Part I (Regulations 7–13, pp3–6) governs SRAS: eligibility of generating stations, energy-storage resources and demand-response entities; minimum response and response-time conditions; activation based on Area Control Error; the ACE formula and two control modes; procurement through SLDC with standing consent and monthly declared charges; merit-order selection and automatic despatch signals; payment to and from the state deviation fund; no incentive in the introductory stage; performance monitoring and disqualification for sustained poor performance.

Part II (Regulation 14, p6) deems section-62 generating stations available for SRAS in shortfall or emergency conditions. Part III (Regulations 15–16, pp6–7) covers weekly accounting, settlement through the DSM Regulations, and exemption from transmission charges and losses for SRAS. Miscellaneous (Regulations 17–19, pp7–8) requires SLDC to submit a Detailed Procedure for approval, with newspaper publication and stakeholder objections, and gives the Commission power to relax provisions and issue directions. No Part IV appears.

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Scheduling and despatch, Deviation settlement (DSM)

Read with this

Earlier drafts

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document