Skip to content

DERC · Delhi Electricity Regulatory Commission

Delhi State Grid Code Regulations, 2008

Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008

CodeDated 31 Mar 2008No. F. 17(14)/Engg./DERC/2003-04/---. dated 31st March, 2008

1 amendment to it is on Voltaic, dated 20 Jan 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 38. Check the regulator's original before you rely on it.

These are DERC's State Grid Code Regulations, 2008, notified on 31 March 2008 (p4) and extending to the whole NCT of Delhi (p4). They are made under the Electricity Act 2003, s.181(2)(zp) r/w s.86(1)(h), and take effect from Gazette publication, whose date is not printed (p4). The Code governs the boundary between the STU, transmission licensees and users of the state transmission system (STS), not detailed generator or distribution design (p6).

Chapter I (p4–10) gives short title, definitions, objective, scope and management. It applies to SLDC, every transmission licensee including STU, and users connected to/using STS, with a one-year transition for existing entities and Commission power to grant relief (p6–7). It establishes a Grid Coordination Committee to oversee implementation, review the code annually and examine disturbances (p7–9), and lists functional responsibilities of SLDC, STU, transmission licensees, discoms and generating companies (p9–11).

Chapter II (p11–13) is the Planning Code: STU must publish a rolling five-year transmission plan, apply CEA-derived planning criteria, and collect standard and detailed planning data from licensees and users.

Chapter III (p14–23) covers connection conditions: connection and safety standards, application and offer process, connection agreements, grid parameter variation limits, equipment, protection, reactive compensation, communication and recording instruments, operational safety and site access. Annexure-I provides a model connection agreement (p20–22), Annexure-II a site responsibility schedule (p23).

Chapter IV (p24–31) is the Operating Code: SLDC operating procedures, system security, demand forecasting, manual demand disconnection, reports, operational liaison, outage planning, restoration and event reporting. Chapter V (p32–33) makes scheduling and despatch compatible with IEGC, with IEGC overriding inconsistencies, and requires detailed scheduling/despatch procedures under intra-state ABT. Later chapters in the index cover metering and miscellaneous powers including compliance, amendment, relaxation, removal of difficulties and interpretation (Chapter VII, p37–38).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Network planning and investment, Scheduling and despatch

Read with this

Amendments and corrections

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document