Skip to content

DERC · Delhi Electricity Regulatory Commission

State Grid Code (First Amendment) Regulations, 2008

Delhi Electricity Regulatory Commission (State Grid Code) (First Amendment) Regulations, 2008

AmendmentDated 20 Jan 2012No. 17(14)/DERC/2010-11/2720 dated 20th January, 2012

Amends the Delhi State Grid Code Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This notification is the First Amendment to the Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008. Issued under s.181(2)(zp) read with s.86(1)(h) of the Electricity Act 2003, it revises 16 clauses of the principal Grid Code, and is framed as a review under clause 6.3 of that Code (p1). It applies to STU, DISCOMs, transmission licensees, generating stations and open access customers on the Delhi State grid.

The amendments tighten transmission planning and disclosure obligations. Clause 8.1 now requires the STU to publish the transmission/sub-transmission system plan and single line diagrams, and to flag inter-DISCOM load flow planning, with monthly network updates (p1–2). Clause 8.4(i) extends the plan horizon to the FY 2012-13 to 2014-15 MYT period and requires project status and delay reporting every six months (p2). Clause 8.4(ii) creates a Planning Steering Committee under the STU with binding approval over DISCOM sub-transmission schemes, with the criteria to be set by a Planning Code to be formulated within three months (p2). Clause 8.5 gives the STU information-gathering powers and makes DISCOMs primarily responsible for long-term load forecasts, with DISCOMs required to submit asset-sharing avoidance schemes within six months (p2–3).

Grid operation clauses are also amended: relay setting coordination (16.3.2); connection agreement facilities and real-time SCADA connectivity to SLDC (17.2); a 5% instantaneous output increase requirement for generating units and SLDC permission for non-compliant units above 50 MW (22.11); frequency-restriction and load-shedding duties at 49.7 Hz and 49.5 Hz, contingency procedures, automatic demand management, interruptible load groups and SLDC direction formats (22.17, p4–6); under-frequency and df/dt relay schemes (22.18); disturbance data sharing and tripping reports (22.23); voltage operating ranges for 400 kV down to 11 kV (22.24, p5–6); and event notification between DISCOMs (26.2.2, 26.3).

Outage planning (27.1), Intra-State ABT scheduling procedures (31.1), a metering procedure covering locations, accuracy, data ownership, testing and dispute resolution (33.7), and quarterly non-compliance reporting (34.3) complete the amendment (p6–7). In case of discrepancy between Hindi and English versions, the English text prevails, and the regulations take effect from 20/1/2012 (p7).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Network planning and investment, Scheduling and despatch

Read with this

The regulation

Amendments and corrections

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document