Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Punjab State Grid Code Regulations, 2013

Punjab State Electricity Regulatory Commission (Punjab State Grid Code) Regulations, 2013

CodeDated 14 Feb 2013No.PSERC/Secy./Regu. 80 dated The 14th February, 2013

1 amendment to it is on Voltaic, dated 7 Jan 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software, from pages 1 to 37 of 118. Check the regulator's original before you rely on it.

PSERC issued the Punjab State Grid Code (SGC) Regulations, 2013 by notification No. PSERC/Secy./Regu. 80 dated 14 February 2013, under s.181 read with s.86(1)(h) of the Electricity Act 2003, extending to the whole of Punjab and coming into force on the date of publication in the Punjab Government gazette — a date the text does not print (p1, p23).

Pages 1–11 are reference matter: the code's defined terms, then a table of abbreviations (p11), followed by part-wise (p12) and section-wise (pp13–18) contents covering eight parts and eighteen sections, and a revision sheet (p19).

Part I, General (pp20–34), does two jobs. Section 1 (pp20–25) sets objectives and scope, states that the code binds all Users of the State Transmission System, SLDC, STU and any future transmission licensee, and fixes its relationship with IEGC — the SGC states it is consistent with CERC's IEGC, but IEGC prevails for inter-state transmission (p25). It also covers non-compliance reporting, confidentiality of user information, referral of disputes to the Commission, SLDC's direction-making power, and a two-track applicability rule: new connections and equipment follow the code from the effective date, existing ones continue until the review committee decides otherwise, while operational provisions apply immediately (p23). Section 2 (pp26–34) allocates roles among SLDC, STU, transmission licensees, distribution licensees (including establishment of Distribution Control Centres) and generating companies, and creates the governance machinery: a State Grid Code Review Committee plus four functional committees, with three-yearly review and Commission approval plus gazette notification for revisions (pp29–31). It also sets the derogation regime and consequences of consistent non-compliance (p34).

Part II, Planning Code, begins at p35. Section 3 (pp35–37) specifies planning policy — a rolling ten-year perspective transmission plan updated annually and a five-year forward planning cycle — planning criteria tied to IEGC clause 3.5 and CEA criteria, and distribution licensees' load-forecasting responsibility, with annual data deadlines. Parts III–VIII and Section 18 appear only through the contents list.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Network planning and investment, Scheduling and despatch

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document