TNERC · Tamil Nadu Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement for Wind and Solar Generation Regulations, 2019 — Amendment, 2020
TNERC (Forecasting, Scheduling and Deviation Settlement and related matters for Wind and Solar generation) Regulations, 2019 — notification DSM / Wind and Solar / 21-2
RegulationDated 17 Mar 2020Published in the Gazette 8 Jul 2020TNERC/F&S Wind & Solar/21-2 dated 17.03.2020
Replaced by Forecasting, Scheduling and Deviation Settlement for Wind and Solar Generation Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Published in Part VI—Section 2 of the Tamil Nadu Government Gazette of 8 July 2020, this is a single-clause amendment by the Tamil Nadu Electricity Regulatory Commission to the coming-into-force proviso of its 2019 Forecasting, Scheduling and Deviation Settlement and Related Matters (FSDSM) Regulations for wind and solar generation (p1–2). The gazette contents page also lists the Commission's companion 2019 Deviation Settlement Mechanism Regulations.
The amendment replaces the proviso to regulation 1(2). Where the original text brought the commercial arrangements and the deviation charge and penalty provisions into force six months after the regulations commenced — the explanatory statement puts that date at 21-9-2019 — the substituted proviso leaves the date to be notified by the Commission itself (p2–3).
The explanatory statement gives the reason: representations from stakeholders, including the Tamil Nadu State Load Despatch Centre, asked for more time so that hardware and software could be installed and a trial run carried out before the deviation settlement mechanism goes live (p3). A two-column table sets the existing and substituted provisions side by side (p3).
For an analyst, the practical effect is that the commercial and deviation-settlement teeth of the wind and solar framework stay suspended until a separate Commission notification. Note the gap between the notification date and the signing/gazette dates (p2–3).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.