Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Forecasting, Scheduling and Deviation Settlement for Wind and Solar Generation Regulations, 2024

Tamil Nadu Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and related matters for Wind and Solar Generation) Regulations, 2024

RegulationDated 22 Jan 2024Published in the Gazette 14 Feb 2024TNERC/F&S Wind & Solar /21-1/2024 dated 22-01-2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC's 2024 regulations replace its 2019 framework for how wind and solar generators in Tamil Nadu forecast, schedule and pay for deviations from schedule. Made under s.86(1) and s.181(2)(zp) read with ss.32 and 33 of the Electricity Act, 2003 and gazetted on 14 February 2024 (p1–2), they apply to all wind and solar generators, including hybrid wind-and-solar systems, connected to the intra-state transmission or distribution system — directly or through a pooling sub-station — and using the power for self-consumption or sale within or outside the State; grid-interactive rooftop solar PV projects below 1 MW are excluded (p4). They come into force on Gazette publication, with commercial implementation from 1 April 2024 (p2).

Part A (p4) states the objective — grid integration of wind and solar while maintaining grid security, using SLDC week-ahead, day-ahead and intra-day forecasts and the flexibility of conventional units and inter-grid tie-lines — and provides for review of the regulations, including the absolute-error and deviation-charge formulation, after two years. Part B (pp4–8) is the Forecasting and Scheduling Code: generators must appoint a Qualified Co-ordinating Agency (QCA); the options are a single statewide QCA chosen by majority, a QCA per pooling sub-station, or self/SLDC-based forecasting for lone generators, with registration and criteria set by SLDC. It lays out QCA duties (aggregation, scheduling, de-pooling, data), metering and AMR obligations, day-ahead and week-ahead schedules, one-and-a-half-hourly revisions, consequences for failing to appoint a QCA, and treatment of gaming. SLDC must issue a Detailed Procedure, after stakeholder consultation, within a month for Commission approval within 15 days.

Part C (pp8–9) is the commercial core: intra-state deviations are paid into a State Deviation Pool Account (Wind and Solar) against absolute-error bands set separately for wind and solar, with annual liability capped at a ceiling rate per unit and excess amounts adjusted in subsequent billing; inter-state sales follow CERC's DSM Regulations, 2022 and cannot be aggregated with intra-state schedules. Part D (pp10–12) covers metering and data sharing, QCA–SLDC communication, deviation and energy accounting, the payment mechanism with interest on delay and year-end reconciliation, de-pooling, curtailment (no deviation charge; a separate curtailment procedure within 60 days) and the energy accounting procedure. Part E (pp12–13) covers amendment, the State Power Committee, repeal of the 2019 regulations with savings, and powers to remove difficulties, relax provisions and issue directions. The Explanatory Statement (pp13–14) explains the shift of the absolute-error denominator from available capacity to scheduled generation and the capped ceiling rate.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document