KERC · Karnataka Electricity Regulatory Commission
Rooftop Aero Turbine with Solar or Without Solar Regulations, 2025
KERC (Implementation of rooftop aero turbine with solar or without solar) Regulations, 2025
Regulation · Gazette copyDated 20 Jan 2025No: KERC/S/03/1/1352 dated 20.01.2025
The Gazette copy of the Rooftop Aero Turbine with Solar or Without Solar Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is KERC's framework for rooftop aero turbines (RAT) — small wind turbines mounted on consumer rooftops, with or without solar panels. The preamble (pp1–3) sets out the statutory mandate to promote renewable generation, describes RAT technology and the intent to implement it under the Karnataka RE Policy 2022-27, and records the consultation record: the draft Regulations were gazetted on 10.10.2024, a public hearing was held on 06.12.2024, and the Commission then approved the final Regulations by order dated 20.01.2025 (p3).
Regulations 1–2 (pp3–5) give the short title, commencement on gazette publication, and definitions — eligible consumer, gross and net metering, RAT plant, SRTPV plant, interconnection point. Regulation 3 (p5) obliges distribution licensees to offer gross or net metering on a non-discriminatory, first-come-first-served basis, subject to the KERC Grid Code/Distribution Code and CEA distributed-generation connectivity standards.
Regulation 4 (pp5–6) sets who may install and at what capacity relative to sanctioned load, and Regulation 5 (pp6–7) lays out the licensee's application, approval, PPA and reporting process, including a commissioning deadline with a tariff consequence for delay. Regulation 6 (pp7–10) specifies interconnection voltage bands by plant size, loading limits on transformers and lines, conformity with named codes and standards, and detailed safety and protection requirements.
Regulations 7–8 (pp10–14) provide for determination of a generic tariff (suo motu or on application), and specify the parameters: CUF, single-part tariff structure, tariff period and levelisation, capital cost, debt-equity, loan and finance charges, depreciation, return on equity, working capital interest, O&M escalation and tax treatment. Regulations 9–10 (pp14–16) cover metering and energy accounting and settlement under both metering arrangements. Regulation 11 (p16) governs PPAs, including deemed approval below a capacity threshold and Commission approval above it; Regulations 12–13 (pp16–17) provide for grievance redressal and the Commission's powers to remove difficulties and to amend or relax provisions.
Read with this
The regulation
- Dated 20 Jan 2025Rooftop Aero Turbine with Solar or Without Solar Regulations, 2025
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.