Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Distribution Performance Standards (Revision-II) Regulations, 2012

Madhya Pradesh Electricity Regulatory Commission (Distribution Performance Standards) (Revision-II) Regulations, 2012 [No. RG-8(II) of 2012]

RegulationDated 12 Nov 2012No. 3148/ MPERC/2012 dated 12th November, 2012

2 amendments to it are on Voltaic, the latest dated 17 Aug 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The MPERC (Distribution Performance Standards) (Revision-II) Regulations, 2012 replace the Commission's 2005 performance standards and set out what every distribution licensee in Madhya Pradesh must deliver, how it must report, and what it must pay consumers when it falls short (p1, p12).

Chapters I–II (p1–4) name the regulations, apply them to all distribution licensees across the whole State and fix commencement at Gazette publication. They define the actors and terms — applicant, consumer, distribution licensee, area of supply, fuse-off call, harmonics, EHV/HT/LT voltage bands, rural areas, towns and cities — and state the objective: minimum system performance, users able to design to their electrical environment, and gradual improvement in quality.

Chapter III (p4–5) requires quarterly and consolidated annual reports of achieved performance against both guaranteed and overall standards, due 30 days after each quarter, with penalty for non-submission, and copies to the Electricity Ombudsman. Chapter IV (p5) anchors construction, operation and maintenance in the CEA safety regulations and allows disconnection for unsafe non-compliance.

Chapter V (p5) makes the standards in Appendix A guaranteed minimum service standards carrying compensation, with Chapter IX standards as overall standards. Chapter VI (p6) sets voltage-variation bands at LT, HT and EHV, timelines for resolving voltage complaints (10 days without network expansion, 180 days or longer with approval where an upgrade is needed), and a harmonics-monitoring duty at strategic HT points. Chapter VII (p7) sets monthly reporting on 11 kV feeders in commissionerates, district headquarters and industrial growth centres, defines the Feeder Reliability Index and fixes interruption parameters with prior-approval thresholds.

Chapter VIII (p8–10) is the enforcement core: rebate-based compensation for consumers who paid their bills in the preceding six months, a 30-day claim window, audit report contents, a panel-based audit agency process with rotation limits, reliability and accuracy grading that determines how much compensation a licensee may recover through ARR, and a six-month deadline for a voltage-reliability scheme. Chapter IX (p10–11) sets overall standards with percentage achievement targets for fuse-off calls, line breakdowns, query response, transformer replacement, scheduled outages, street lights, billing mistakes, faulty meters, new connections and ownership transfer. Chapter X (p11) defines interruptions and suspends standards for force majeure, generation/transmission failures and SLDC/RLDC/NLDC-initiated outages, with 30-day reporting. Chapter XI (p12) gives powers to amend and remove difficulties and supersedes the Revision-I 2005 regulations. Appendix A (p13–14) is the service-by-service guaranteed standards and compensation table.

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality, New connections and load changes

Read with this

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.