Distribution Performance Standards (Revision-II) Regulations, 2012 — First Amendment, 2021

Madhya Pradesh Electricity Regulatory Commission (Distribution Performance Standards) (Revision-II) (First Amendment) Regulations, 2012 {ARG-8(II )(i) of 2021}

AmendmentDated 15 Jul 2021No 984/MPERC/2021 dated 15th July 2021

Amends the Distribution Performance Standards (Revision-II) Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MPERC's First Amendment to its 2012 Distribution Performance Standards (Revision-II) Regulations was issued in Bhopal on 15 July 2021 as No 984/MPERC/2021 (ARG-8(II)(i) of 2021). It bolts consumer-service and supply-reliability obligations onto the principal regulations, chiefly to give effect to the Electricity (Rights of Consumers) Rules, 2020 (p1).

Clause 2 adds regulations 7.4–7.6 to Chapter VII. The distribution licensee must report outage duration and frequency to the Commission using SAIDI and SAIFI, with the minimum outage duration counted in those indices left to a separate Commission order (p1). It must supply 24x7 power to all consumers except agriculture consumers fed through separate agriculture feeders, who must get a minimum daily supply window (p1–2). A mechanism — preferably automated — for monitoring and restoring outages is required, with the deadline tied to notification of the 2020 Rules (p2).

Clause 3 adds 8.1A–8.1C and 8.2A–8.2B to Chapter VIII, creating automatic compensation for parameters that can be monitored remotely, requiring the licensee to progressively widen that set, to build an automatic payment mechanism under section 57(2), to open an online claim facility, and to pay compensation by adjustment against bills within a fixed period of claim determination (p2).

Clause 4 adds 9.11–9.13 to Chapter IX: a centralised 24x7 toll-free call centre for listed common services, with separate compliance deadlines for existing and new licensees, and a common Customer Relation Manager system offering SMS/email alerts, online status tracking and auto-escalation (p2–3).

Clause 5 substitutes Appendix A, the guaranteed-standards-and-compensation table. It covers fuse-off calls, line-breakdown restoration, distribution transformer failure, scheduled outages, meter complaints, new connections and load changes, conversion of service, bill complaints and bill serving, reconnection, temporary connections and no-dues certificates, differentiating urban and rural areas and the commissioning headquarter (p3–5).

Standard name
Standards of Performance
Primary topics
Standards of performance, Conditions of supply, Billing and payment

Read with this

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document