Distribution Performance Standards (Revision-II) Regulations, 2012 — First Amendment, 2021
Madhya Pradesh Electricity Regulatory Commission (Distribution Performance Standards) (Revision-II) (First Amendment) Regulations, 2012 {ARG-8(II )(i) of 2021}
AmendmentDated 15 Jul 2021No 984/MPERC/2021 dated 15th July 2021
Amends the Distribution Performance Standards (Revision-II) Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
MPERC's First Amendment to its 2012 Distribution Performance Standards (Revision-II) Regulations was issued in Bhopal on 15 July 2021 as No 984/MPERC/2021 (ARG-8(II)(i) of 2021). It bolts consumer-service and supply-reliability obligations onto the principal regulations, chiefly to give effect to the Electricity (Rights of Consumers) Rules, 2020 (p1).
Clause 2 adds regulations 7.4–7.6 to Chapter VII. The distribution licensee must report outage duration and frequency to the Commission using SAIDI and SAIFI, with the minimum outage duration counted in those indices left to a separate Commission order (p1). It must supply 24x7 power to all consumers except agriculture consumers fed through separate agriculture feeders, who must get a minimum daily supply window (p1–2). A mechanism — preferably automated — for monitoring and restoring outages is required, with the deadline tied to notification of the 2020 Rules (p2).
Clause 3 adds 8.1A–8.1C and 8.2A–8.2B to Chapter VIII, creating automatic compensation for parameters that can be monitored remotely, requiring the licensee to progressively widen that set, to build an automatic payment mechanism under section 57(2), to open an online claim facility, and to pay compensation by adjustment against bills within a fixed period of claim determination (p2).
Clause 4 adds 9.11–9.13 to Chapter IX: a centralised 24x7 toll-free call centre for listed common services, with separate compliance deadlines for existing and new licensees, and a common Customer Relation Manager system offering SMS/email alerts, online status tracking and auto-escalation (p2–3).
Clause 5 substitutes Appendix A, the guaranteed-standards-and-compensation table. It covers fuse-off calls, line-breakdown restoration, distribution transformer failure, scheduled outages, meter complaints, new connections and load changes, conversion of service, bill complaints and bill serving, reconnection, temporary connections and no-dues certificates, differentiating urban and rural areas and the commissioning headquarter (p3–5).
Read with this
The regulation
- Dated 12 Nov 2012Distribution Performance Standards (Revision-II) Regulations, 2012
Amendments and corrections
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.