The document is the Jharkhand State Electricity Regulatory Commission (State Grid Code) Regulations, 2008, notified as No JSERC/81/19 and published in the Jharkhand Gazette Extraordinary dated 4 February 2009; it comes into force from Gazette publication (p1). It applies across Jharkhand and is made under the Electricity Act 2003, clause (zp) of section 181 read with clause (h) of section 86 (p1). Its introduction describes a full grid code in Parts A–G, but the supplied text covers the general/definitions and Parts A–E; Parts F (Commercial Code) and G (Miscellaneous Code) are only described in the contents (pp2–3).
Part A (pp6–9) sets scope: SLDC, STU, intra-state transmission licensees, generating stations and users connected to or using the state grid. The Commission may relieve a licensee or user from compliance, and the code must be read consistently with CERC’s Grid Code (p6). Existing connections get one year to enter connection agreements, prepare site responsibility schedules, single line diagrams and site common drawings (pp6–7). It creates a Grid Coordination Committee within 60 days — composition, chair/convenor roles, monthly meetings, six-monthly review reports, and coordination functions across planning, operations and commercial energy accounting (pp7–9). It also deals with publication of the code and independent SLDC functioning (pp7–9).
Part B (pp9–13) is the Planning Code. STU is nodal agency for intra-state transmission planning, must publish a rolling five-year plan updated yearly, coordinate with CTU, and use specified inputs such as CEA plans, Electric Power Survey, grid standards and National Electricity Policy (pp9–11). It sets planning criteria, including contingency outages to withstand, transformer requirements, reactive-power planning, standard and detailed planning data, annual asset schedule, and implementation responsibilities (pp11–13).
Part C (pp13–21) is the Connection Code. It adopts CEA technical and safety standards; sets objectives and scope for connection applications; requires an application process handled by STU; and requires connection agreements covering compliance, technical/commercial terms, cost sharing, protection, records and communications (pp13–16). It then specifies grid parameter variation, connection-point equipment, fault clearance and protection, reactive-power compensation, communication facilities, generating-unit capability, governor/AVR requirements, recording instruments, site responsibility schedules, single line diagrams, site common drawings and site access (pp16–21).
Part D (pp21–31) is the Operating Code. SLDC supervises the state grid in coordination with RLDC, maintains internal operating procedures, and controls round-the-clock control rooms (p21). It sets system security and restoration rules, including restrictions on deliberate isolation, governor and AVR requirements, frequency and voltage operating ranges, demand forecasting, manual load disconnection, weekly/quarterly reports, operational liaison, outage planning and coordination, recovery procedures, event reporting, and SLDC/sub-LDC roles (pp21–31).
Part E (pp31–33) is the Scheduling and Despatch Code. SLDC has exclusive responsibility for optimum scheduling and dispatch within Jharkhand, issuing day-ahead despatch instructions, respecting must-run hydro and renewable energy, using ABT/merit-order concepts, and handling deviations and unscheduled interchange (pp31–33). It defines the 96 fifteen-minute time blocks, data submission deadlines and metering/energy-accounting responsibilities (p33).
Read with this
Amendments and corrections
- Dated 4 Oct 2019State Grid Code, 2008 — 1st Amendment, 2019
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.