CSERC · Chhattisgarh State Electricity Regulatory Commission

Generation Tariff for Non-Conventional Sources of Energy Regulations, 2008

Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on non-conventional sources of energy) Regulations, 2008

RegulationDated 22 May 2008No. 28/CSERC/2008 dated 22/05/2008

Replaced by Generation Tariff for Renewable Energy Sources Regulations, 2012

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CSERC's 2008 principal regulation for determining generation tariff for electricity generated from non-conventional sources — specifically biomass-based plants and small hydro — and sold to distribution licensees in Chhattisgarh. The Statement of Objects and Reasons (p1–2) says the Electricity Act 2003, the National Electricity Policy and the Tariff Policy 2006 require preferential tariffs for renewables, and that these regulations respond to the Appellate Tribunal for Electricity's direction dated 07.09.2006 in Appeal No 20 of 2006. Wind and solar are expressly kept out because their scope is not established in the State; the SoR says they may be added later (p1).

Chapter 1 gives the short title, commencement on publication in the Chhattisgarh Rajpatra (date not printed) and extent to the whole State. It binds distribution licensees including the Chhattisgarh State Electricity Board and its successor, small hydro stations up to and including 25 MW, and biomass-based generating stations (p2). Chapter 2 defines the technical and commercial terms used in the tariff norms (p2–4).

Chapter 3 sets tariff principles: separate tariff for each renewable source; preferential tariff for procurement by distribution licensees; PPA-linked duration generally of ten years or more; adoption of tariffs discovered through transparent bidding under section 63; and guidance from sections 61 and 62 of the Act, CERC principles, the National Electricity Policy and Tariff Policy para 6.4, with a power to deviate for stated reasons. It carves out PPAs already entered into before notification, whose tariffs follow their PPAs and the Commission's 15.01.2008 order (p4–5). Chapter 4 sets the two-stage application route for provisional tariff before completion and final tariff after commercial operation (p5).

Chapter 5 is the biomass tariff code: a two-part tariff of fixed charges and energy (variable) charges, with normative parameters for capital cost, capacity utilisation factor, fuel mix, station heat rate, calorific value, fuel cost and auxiliary consumption, followed by debt-equity, interest on term loans, depreciation and advance against depreciation, return on equity, O&M, working capital, energy charge, and infirm and non-firm power rates (p5–9). Chapter 6 does the same for small hydro, but as a fixed-cost-only tariff, with its own auxiliary consumption, CUF, capital cost ceilings, additional capitalisation, O&M, working capital, royalty pass-through and infirm/non-firm tariff treatment (p9–11).

Chapters 7 to 13 cover open access transmission/wheeling charges and cross-subsidy surcharge for renewables; treatment of MNRE subsidy; CDM benefit exclusion; the 20-year PPA term and prior Commission approval of draft PPAs; scheduling obligations, with conditional exemption for small hydro; treatment of infirm power revenue as a capital-cost reduction; and banking rules including eligibility, metering, duration, charges and timing-based tariff adjustments (p11–13). Chapters 14 to 16 give the Commission power to remove difficulties, to review or amend the regulations after three years, and savings that preserve its inherent and residuary powers (p13).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Generation tariff, Renewable energy tariff, Tariff determination

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document