Generation Tariff for Renewable Energy Sources Regulations, 2012

Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based renewable energy sources) Regulations, 2012

RegulationDated 27 Jul 2012No. 42/CSERC/2012 dated July 27, 2012

Replaced by Renewable Energy Generation Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CSERC's principal tariff regulation for renewable energy generation in Chhattisgarh. It is dated 27 July 2012 but is brought into force from 1 April 2012 for a five-year control period ending FY 2016-17 (p1–2, p9). It applies to RE projects in the State achieving COD after 1 April 2012 that sell to distribution licensees under long-term PPAs of 20 years or more, where the Commission determines tariff under ss.62 and 86 of the Electricity Act (p7). It repeals the 2008 non-conventional energy tariff regulations, while preserving orders issued under them until their stated currency (p2, p33).

The regulation has two operational halves. Chapters 1–2 set general principles and financial norms: control and tariff periods, project-specific tariff routes, petition requirements, tariff structure and design, dispatch principles, capital cost, debt-equity, loan and finance charges, depreciation, return on equity, working capital, O&M, rebate, late payment surcharge, ceiling norms, subsidy treatment and pass-through of cess/duties (p9–18). Chapters 3–8 then set technology-specific parameters for wind, small hydro, biomass Rankine-cycle power, non-fossil-fuel cogeneration, solar PV and solar thermal, including capital cost, indexation, CUF/PLF, auxiliary consumption, heat rate, fuel and fossil-fuel mix, monitoring by CREDA, and O&M (p19–32). Chapter 9 gives deviation, relaxation and difficulty-removal powers and the repeal (p33). Forms for tariff and fuel-use submissions are appended (p34–39).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Generation tariff, Renewable energy tariff, Tariff determination

Read with this

6 more documents belong here and are not on Voltaic: 4 copies in another language and 2 corrigenda not held as English text.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.