CSERC · Chhattisgarh State Electricity Regulatory Commission
Renewable Purchase Obligation and REC Framework Implementation Regulations, 2021 — First Amendment, 2022
CSERC (Renewable Purchase Obligation and REC framework Implementation) (First Amendment) Regulations, 2022
AmendmentDated 20 Dec 2022No. 97/CSERC/2022 dated 20th December 2022
Amends the Renewable Purchase Obligation and REC Framework Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the First Amendment to the CSERC (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2021, issued as Notification No. 97/CSERC/2022 dated 20 December 2022 (p7). The preamble explains that the amendment is needed to align the state RPO trajectory with the MoP order dated 22.07.2022 and its corrigendum dated 19.09.2022, and to give effect to MNRE, CERC and MoP measures on biomass co-firing in coal-based thermal plants (p7–8).
Regulation 1 gives the short title, extends the amendment to Chhattisgarh and states that it comes into force from publication in the CG Rajpatra (p8). Regulation 2 substitutes the last paragraph of regulation 3 of the Principal Regulations, setting the RPO framework period and continuing the FY 2029-30 RPO beyond 2029-30 until the Commission revises it (p8). Regulation 3 substitutes regulation 4.2, specifying which renewable purchases count for RPO, giving special treatment to biomass-based and biomass co-fired thermal purchases, and providing that the biomass estimation methodology in Annexure-A applies to coal-based thermal, captive and co-generation plants (p8–9).
Regulation 4 replaces Table 1 in regulation 4.3 with a year-wise RPO trajectory covering wind, hydro and other categories, and adds conditions for meeting wind and hydro RPO, carry-forward between categories, and an energy storage obligation trajectory with a condition that at least 85% of stored energy be from renewable sources (p9–10). Regulation 5 makes the RPO and storage obligation subject to future MoP/MNRE amendments (p10). Regulation 6 substitutes regulation 4.4 on procurement tariffs and existing long-term contracts (p10). Regulation 7 adds Annexure-A, which sets the step-by-step methodology for estimating biomass-generated electricity, including heat input from biomass and coal and ex-bus allocation (p11–12).
Read with this
The regulation
- Dated 29 Oct 2021Renewable Purchase Obligation and REC Framework Regulations, 2021
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.