Renewable Purchase Obligation and REC Framework Implementation Regulations, 2021 — First Amendment, 2022

CSERC (Renewable Purchase Obligation and REC framework Implementation) (First Amendment) Regulations, 2022

AmendmentDated 20 Dec 2022No. 97/CSERC/2022 dated 20th December 2022

Amends the Renewable Purchase Obligation and REC Framework Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the First Amendment to the CSERC (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2021, issued as Notification No. 97/CSERC/2022 dated 20 December 2022 (p7). The preamble explains that the amendment is needed to align the state RPO trajectory with the MoP order dated 22.07.2022 and its corrigendum dated 19.09.2022, and to give effect to MNRE, CERC and MoP measures on biomass co-firing in coal-based thermal plants (p7–8).

Regulation 1 gives the short title, extends the amendment to Chhattisgarh and states that it comes into force from publication in the CG Rajpatra (p8). Regulation 2 substitutes the last paragraph of regulation 3 of the Principal Regulations, setting the RPO framework period and continuing the FY 2029-30 RPO beyond 2029-30 until the Commission revises it (p8). Regulation 3 substitutes regulation 4.2, specifying which renewable purchases count for RPO, giving special treatment to biomass-based and biomass co-fired thermal purchases, and providing that the biomass estimation methodology in Annexure-A applies to coal-based thermal, captive and co-generation plants (p8–9).

Regulation 4 replaces Table 1 in regulation 4.3 with a year-wise RPO trajectory covering wind, hydro and other categories, and adds conditions for meeting wind and hydro RPO, carry-forward between categories, and an energy storage obligation trajectory with a condition that at least 85% of stored energy be from renewable sources (p9–10). Regulation 5 makes the RPO and storage obligation subject to future MoP/MNRE amendments (p10). Regulation 6 substitutes regulation 4.4 on procurement tariffs and existing long-term contracts (p10). Regulation 7 adds Annexure-A, which sets the step-by-step methodology for estimating biomass-generated electricity, including heat input from biomass and coal and ex-bus allocation (p11–12).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document