BESS Regulations, 2025 — Statement of Reasons

Andhra Pradesh Electricity Regulatory Commission [Planning, Procurement, Deployment, and Utilisation of Battery Energy Storage Systems (BESS)] Regulations, 2025

Statement of reasonsDated 10 Sep 2025Regulation No. 5 of 2025 dated 10.09.2025

The commission's reasons for the BESS Regulations, 2025 — Regulation 5.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 44. Check the regulator's original before you rely on it.

The document is APERC's Statement of Reasons/Order dated 10.09.2025 (p1) for the APERC [Planning, Procurement, Deployment, and Utilisation of BESS] Regulations, 2025, carrying the final Regulation as Annexure II under Regulation No. 5 of 2025 (p32). It explains why the Commission finalised the BESS framework after the MoP BESS guidelines of 11.03.2022 and the National Framework for Energy Storage Systems of August 2023, and after GoAP's Integrated Clean Energy Policy, 2024, under which the State sought BESS/ancillary services rules and set storage targets (p1–2, p32).

The Commission published the draft for public comment on June 30, 2025, received objections/suggestions from 11 stakeholders, and then went through the draft clause by clause (p2). The main body (pp2–30) records those comments and the Commission's decisions. It broadens the DER aggregator role beyond residential/subsidised consumers; retains the banking definition linked to the 2024 Green Energy Open Access Regulation; narrows the BESS definition to battery technologies; and adds new definitions for BESS Developer, Standalone BESS and modifies force majeure terminology (pp2–6). It retains the ownership and business-model list, adds EV charging/battery-swapping and V2G/G2V deployment categories, and permits SLDC/DISCOM/APTRANSCO ownership subject to safeguards (pp7–10). Procurement provisions are amended: reverse-flow site selection, co-location encouraged but not mandated, minimum 1 MW and at least two hours for grid-connected BESS at 11 kV or above, with consumer/LT/open-access choices (pp10–12).

The SoR then expands ancillary services to include demand response and resource-adequacy consideration (pp12–13), sets aggregator registration through DISCOMs (pp13–14), leaves commercial agreements as drafted (pp14–15), requires tariff-based competitive bidding for licensee procurement while allowing licensee-owned cost recovery through ARR (pp15–17, pp19–22), and updates technical standards, real-time SLDC reporting, safety, cyber and disposal responsibilities (pp17–18). Roles and obligations are specified for DISCOMs, APTRANSCO, APSLDC, GENCOs/IPPs/CPPs/BESSDs, consumers/prosumers and the Commission (pp18–28). A new dispute-resolution clause routes consumer disputes to CGRF and other disputes to the Commission (pp28–29). General objections note that targets will follow licensee studies and no further consultation will occur after finalisation (pp29–30). Annexure I lists objectors (p31); Annexure II begins the final Regulation.

Standard name
Energy Storage
Primary topics
Energy storage deployment, Competitive bidding, Ancillary services and reserves

Read with this

The regulation

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document