APERC · Andhra Pradesh Electricity Regulatory Commission
BESS Regulations, 2025 — Regulation 5
Regulation 5 of 2025 BESS Regulations
RegulationDated 11 Sep 2025Published in the Gazette 11 Sep 2025No.614 dated SEPTEMBER 11, 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is APERC's principal regulation for battery energy storage — Regulation No. 5 of 2025, published in the Andhra Pradesh Gazette on 11 September 2025 (p1) and in force from that publication (p3). It creates the framework under which BESS is planned, procured, owned, operated and paid for in the State.
The preamble (p1–3) anchors the regulation in the Electricity Act, 2003, the Ministry of Power's BESS guidelines of 11 March 2022, the National Framework for Energy Storage Systems of August 2023 and the Andhra Pradesh Integrated Clean Energy Policy, 2024, and records a State Government direction under Section 108 plus a stakeholder-consultation Order dated 10.09.2025.
Regulations 1–3 (p3–7) give the title, commencement and applicability — licensees, generating companies, RE developers, aggregators and BESS service providers — a long definitions clause covering BESS, standalone BESS, aggregators/DERA, the ancillary-service family (PRAS, SRAS, TRAS, AGC), banking, firm and dispatchable RE power and un-requisitioned surplus, and four objectives.
Regulations 4–9 (p7–9) cover who may own BESS and in what configurations, its legal status, planning and procurement (siting criteria, a minimum project-size and voltage threshold — "power rating of 1MW and above, with a suitable energy rating of at least two hours based on the application at one site, connected at 11 kV or above" (p8) — and prior Commission approval of capacity procurement), eligibility to supply ancillary services, the aggregator role, commercial agreements, and tariff and market participation, including competitive bidding for licensee procurement, cost-recovery routes and preservation of RPO/RCO benefit on renewable energy discharged from storage.
Regulations 10–17 (p9–13) allocate duties: technical standards and data reporting; safety, cybersecurity and end-of-life disposal; DISCOM obligations (publishing potential sites and registered aggregators, registering AS providers, ARR treatment, a behind-the-meter database); APTRANSCO's agreement-format duty; APSLDC as nodal agency (verifying governor settings, assessing PRAS/SRAS/TRAS needs, publishing eligibility criteria, preparing the scheduling/metering/settlement procedure for Commission approval, monitoring performance); the roles of GENCOs/IPPs/CPPs/BESS developers, consumers and prosumers; and open access, left to the 2024 Green Energy Open Access Regulation.
Regulations 18–23 (p13–14) set the Commission's approval and monitoring role and its power to mandate a BESS obligation later, dispute resolution, and powers to direct, relax, amend and remove difficulties.
Read with this
Commencement notices and reasons
- Dated 10 Sep 2025BESS Regulations, 2025 — Statement of Reasons
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.