Skip to content

CERC · Central Electricity Regulatory Commission

Power System Development Fund Regulations, 2019

Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2019

Regulation · Gazette copyDated 28 Aug 2019No. L-1/247/2019/CERC dated 28th August, 2019

The Gazette copy of the Power System Development Fund Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the CERC notification of the Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2019, made under s.178(1) and s.178(2)(ze) of the Electricity Act, 2003 and published from New Delhi on 28 August 2019 (p4). It replaces the 2014 PSDF regulations and restates the framework for how the Power System Development Fund is built up, spent, governed and reported on.

Regulation 2 sets definitions, mostly by cross-reference to other CERC instruments and to Central Government Guidelines issued by Office Memorandum of 18 September 2014 (p5). Regulation 3 constitutes the PSDF and specifies the revenue streams credited to it — congestion charges, congestion amounts from market splitting, deviation settlement charges, reactive energy charges, additional transmission charges from short-term open access explicit auction, and any other charges the Commission may notify — and requires the collecting agencies to transfer them periodically, with the fund held in the Public Account of India (p5–6).

Regulation 4 governs utilization: funding is by way of grant, the grant is reduced from project capital cost so it is not tariffed, and it lists the eligible purposes (transmission of strategic importance to relieve congestion, reactive energy equipment, protection schemes and pilot projects, R&M of transmission and distribution, and allied studies/capacity building). It also allows support to distribution utility projects incidental to ISTS, extends eligibility to Central Government schemes needing PSDF support, lets the Central Government prioritize sanctions, and excludes private sector projects (p6).

Regulations 5 to 7 designate NLDC as Nodal Agency, list its functions, describe the sanction route through the Appraisal Committee, Nodal Agency and Monitoring Committee, place execution and O&M responsibility on the project entity, and require an Annual Report to the Central Government and the Commission and to Parliament (p6–7). Regulation 8 repeals the 2014 regulations with a savings clause deeming past actions valid (p7).

Primary topics
Power System Development Fund (PSDF)

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document