This is a draft notification (No. L-1/247/2019/CERC) dated 24 May 2019 by which CERC proposes to replace its 2014 Power System Development Fund regulations with a new set of 2019 regulations, made under s.178(1) and s.178(2)(ze) of the Electricity Act, 2003 (p1). It runs to eight regulations across six pages and is complete in itself; commencement is tied to publication in the Official Gazette, whose date is not printed (p1).
Regulation 2 defines the fund's vocabulary and cross-refers to the congestion relief, power market, deviation settlement and grid code regulations that supply the charges flowing into the fund (p1–3). Regulation 3 constitutes the PSDF, lists the charge streams credited to it, obliges collecting agencies to transfer them periodically, and places the fund in the Public Account of India (p3–4).
Regulation 4 is the spending rule: assistance is grant-based and netted off project capital cost, and is confined to enumerated categories — strategic transmission, reactive compensation, protection schemes and protection audits, renovation and modernisation, and studies or capacity building — with a route for distribution utility projects incidental to the inter-State transmission system, a route for Central Government schemes, prioritisation by the Central Government, and an express exclusion of private sector projects (p4–5).
Regulation 5 makes NLDC the Nodal Agency, with a proviso letting the Central Government substitute another agency, and lists its record-keeping, budget/audit procedure, annual report and residual functions (p5). Regulation 6 leaves application, appraisal, sanction and disbursal procedure to Central Government guidelines, routes proposals through the Appraisal Committee and Monitoring Committee, obliges project entities to furnish project details, and places execution and O&M on the project entity for the asset's useful life (p5–6). Regulation 7 requires an annual PSDF report to the Central Government and the Commission, laid before both Houses of Parliament through the Ministry of Power (p6). Regulation 8 repeals the 2014 regulations with a savings clause preserving past actions (p6).
Read with this
The regulation
- Dated 28 Aug 2019Power System Development Fund Regulations, 2019
Commencement notices and reasons
- Dated 4 Sep 2019PSDF Regulations, 2019 — Statement of Reasons
Other copies of these documents (1)
- Dated 28 Aug 2019Power System Development Fund Regulations, 2019
Earlier drafts
- Released with the notice dated 24 May 2019Explanatory memorandum: Draft Power System Development Fund Regulations, 2019 — Explanatory Memorandum
- Dated 24 May 2019Public notice: Draft Power System Development Fund Regulations, 2019 — Public Notice
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.