DERC · Delhi Electricity Regulatory Commission

Business Plan Regulations, 2019

Delhi Electricity Regulatory Commission (Business Plan) Regulations, 2019

Public notice on a draftDated 22 Nov 2019F.3(596)/Tariff/DERC/2019-20/6641

Draft

The draft has since been finalised as the Business Plan Regulations, 2019.

Public notice on a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The DERC (Business Plan) Regulations, 2019 (p2) are a three-year control-period instrument. Rather than setting tariffs, they fix the parameters the Commission will use to build tariffs and annual revenue requirements for Delhi's generators, transmitters and distribution licensees over FY 2020-21, FY 2021-22 and FY 2022-23 (p2). They are notified under s.181 read with s.61 and s.86(1)(b) of the Electricity Act, 2003, and take most of their operative content by cross-reference to the DERC (Terms and Conditions for Determination of Tariff) Regulations, 2017.

Part 1 (pp2–3) gives the short title, the three-year term (extendable at the Commission's discretion), Delhi-wide extent, and a definitions clause that imports the meanings used in the 2017 Tariff Regulations.

Part 2 (pp4–8) is the generating entity's business plan: how return on equity is computed and grossed up for tax, the margin allowed over SBI's one-year MCLR on loan interest, normative O&M expense rates, a tentative capital investment plan, operating norms (plant availability and load factor, gross station heat rate, auxiliary energy consumption), a generation incentive, a gain-sharing mechanism on controllable heat rate and auxiliary consumption, and sharing of re-financing gains.

Part 3 (pp9–13) mirrors this for the transmission licensee and adds a normative transmission availability factor, the monthly transmission-charge billing formula tied to availability, and cross-references to the availability computation in the appendices.

Part 4 (pp14–28) is the distribution plan, covering BRPL, BYPL, TPDDL and NDMC. It separates wheeling, retail and carrying-cost returns on equity, differentiates O&M norms by licensee and network element, adopts capitalisation plans, sets distribution-loss and collection-efficiency targets, sets renewable purchase obligation trajectories with compliance and penalty mechanics, imposes a deviation-settlement contingency limit, prescribes incentive sharing on surplus power sales, lays out the power purchase cost adjustment mechanism, fixes the ARR split between wheeling and retail business, and provides for true-up of revenue gap/surplus and ToD time slots.

Part 5 (pp29–30) is the standard machinery: orders and practice directions, removal of difficulties, relaxation, interpretation, inherent powers, enquiry procedure and amendment. Appendices I–III (pp31–35) set out the transmission availability computation procedure, surge impedance loading values, and the availability formulae.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document