DERC · Delhi Electricity Regulatory Commission

Business Plan Regulations, 2019

Delhi Electricity Regulatory Commission (Business Plan) Regulations, 2019

RegulationDated 27 Dec 2019F.3(596)/Tariff/DERC/2019-20/6641

Replaced by Business Plan Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The DERC (Business Plan) Regulations, 2019 are a three-year control-period instrument issued by the Delhi Electricity Regulatory Commission under s.181 read with ss.61 and 86(1)(b) of the Electricity Act, 2003 (p2). They apply to the whole NCT of Delhi and remain in force for FY 2020-21, FY 2021-22 and FY 2022-23 unless reviewed earlier; the Commission may extend their validity and operational norms (p2). Part 1 gives short title, period and extent, and provides that undefined terms carry the meaning given in the DERC (Terms and Conditions for Determination of Tariff) Regulations, 2017 or the Act (p2). Part 2 (pp3–7) sets business-plan parameters for the Generating Entity: return on equity and tax gross-up, loan-interest margin, normative O&M expenses, tentative capital investment, operating norms (availability, PLF, heat rate, auxiliary consumption), generation incentive, incentive-sharing for operational parameters, and refinancing gains. Part 3 (pp8–11) does the same for the Transmission Licensee, adding bay/circuit-km O&M norms, normative transmission availability, a monthly transmission charges formula linked to availability, and refinancing incentive sharing. Part 4 (pp12–24) covers Distribution Licensees: wheeling/retail return on equity and tax gross-up, loan margin, O&M norms by licensee and voltage, own-consumption treatment, capital investment and true-up consequences, distribution-loss and collection-efficiency targets, RPO compliance and penalty, deviation-settlement contingency limit, surplus-power sale incentive sharing, PPAC recovery, refinancing sharing, ARR allocation between wheeling and retail, and revenue gap/surplus treatment. Part 5 (p25) contains miscellaneous powers—orders/practice directions, removal of difficulties, relaxation, interpretation, inherent powers, and amendment. Appendix I (pp26–28) prescribes how monthly transmission system availability is calculated; Appendix II (p29) gives surge-impedance-loading data for AC lines.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Return, financing and working capital

Read with this

Commencement notices and reasons

Earlier drafts

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document