Statement of Reasons For Rates, Charges and Terms and Conditions For usage of Intervening Transmission Facilities

Statement of reasonsDated 14 Sep 2010L-1/10/2009-CERC dated 14.9.2010

The commission's reasons for the Rates, Charges and Terms and Conditions for use of Intervening Transmission Facilities Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Statement of Reasons for the CERC (Rates, Charges and Terms and Conditions for use of Intervening Transmission Facilities) Regulations, 2010, dated 14 September 2010 (p1–2). It explains the statutory foundation in Sections 35, 36 and 178(2)(i) of the Electricity Act, 2003 and why CERC regulates facilities that are incidental to inter-State transmission (p2–3).

The background section records the consultation: the draft regulations were published for comments on 14 October 2009, written suggestions came from stakeholders, and a public hearing was held on 28 January 2010 (p3–4). The bulk of the document, pp4–11, is issue-by-issue analysis. The Commission widens the definition of "licensee", defines the contract path, confirms that the regulations bind only licensees (not generating companies or power exchanges), saves agreements made before notification, and explains how the regulations interact with Open Access regulations and prior SERC/CERC determinations (p4–6).

On pricing, it decides that long-term and medium-term use will be charged on an annual per-MW basis and short-term use on a per-MWh basis, discusses ARR and charge-sharing treatment, and gives the methodology for line loading limits and 66 kV lines (p6–9). It then presents final rate tables by voltage level and circuit type, normative transmission losses per 50 km, and reactive energy treatment under the IEGC (p9–10). Availability norms and congestion treatment are left to the parties or the relevant regulator, with fallback to CERC norms and the CERC congestion regulations (p10–11). Annexure-I lists participants at the oral hearing (p12).

Standard name
Transmission Tariff Regulations
Primary topics
Transmission tariff, Losses and loss reduction, Power quality

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.