This is a principal CERC regulation of 2010 setting the model terms, ceiling rates and charges for using another licensee's "intervening transmission facilities" — electric lines that sit incidental to inter-State transmission but whose surplus capacity can be used to carry power for a requesting licensee (p1–2).
The regulation applies only where a contract path can be identified, and only where the requesting trading or distribution licensee and the owning licensee have failed to agree rates and charges themselves; the terms and rates here are a ceiling and a model, and parties may negotiate within that framework (p3). Agreements struck before the notification survive until they expire (p3). Chapter 1 (pp1–4) gives the title, commencement, definitions (Act, Applicant, Contract Path, Grid Code, intervening transmission facilities, Parties, Time block) and the scope, plus fall-backs: transmission availability norms follow the relevant CERC/SERC regulations, and congestion is handled under the CERC (Measures to relieve congestion in real time operation) Regulations, 2009 where the state has none (p4).
Chapter 2 (pp4–5) states that rates and charges are those in Schedule-I, set for a standard 50 km contract path, with a proviso on sharing already-determined annual revenue requirement by the ratio of average to peak power flow, per Schedule-II. Chapter 3 (pp5–7) lays down the operating terms: what an application must contain, a three-working-day consent window, scheduling per the Grid Code, payment security for short-term use and monthly post-facto billing for longer use, default interest with a right to refuse or cancel scheduling with prior Commission approval, energy accounting and deviation settlement under the UI regulations, reactive energy charges, and the line-loss norms by voltage. Chapter 4 (pp7–8) gives dispute adjudication by the Commission and a removal-of-difficulties power. Schedules I and II (p9) hold the rate table by voltage/line capacity and the line-loading capacities used for the sharing formula.
Read with this
Commencement notices and reasons
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.