Summary written by software. Check the regulator's original before you rely on it.
The Commission has published a draft replacement for Karnataka's solar rooftop regulations: the KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026, issued by notification dated 02.06.2026 (p1). It sets out a framework for distributed solar plants up to 10 MW connected to the distribution network at 33 kV or below, and it renames the earlier 'solar rooftop PV' category as 'distributed solar PV' to cover facade panels, roof-mounted mono-/bi-facial panels and elevated ground structures (p1, p3, p9). The preamble records the State's renewable and DSPV capacity, cites grid-integration challenges, and refers to the Forum of Regulators' February 2026 model regulations for grid-interactive distributed renewable energy (p1–2). The draft is open for objections for 15 days from gazette publication and will be considered after that period (p2).
Sections 1–3 cover title, commencement and applicability. The regulations apply to distribution licensees and eligible consumers in Karnataka and come into force on Official Gazette notification (p2). They define the DSPV plant, prosumer, eligible consumer, RESCO, designated consumer, obligated entity and the six metering mechanisms (p3–5). Scope provisions deal with RESCO-owned plants, the 10 kW-plus storage obligation, arrears and open-access consumers (p5–6).
Section 4 is the core eligibility map. It specifies which consumer categories may use net metering, net billing, gross metering, group net metering, virtual net metering and behind-the-meter arrangements, with minimum and maximum capacity rules and a once-in-project switching right (p6–9). Section 5 then prescribes energy accounting and billing for each mechanism, including time-of-day treatment, surplus purchase, GNM/VNM priority lists, lapsed energy and the open-access charge treatment of GNM/VNM (p9–15). Sections 6–8 cover grid support charges, subsidies and hosting capacity (p15). Section 9 sets interconnection and safety standards, including distribution-transformer and feeder loading limits, CEA/IEEE/IEC compliance, O&M responsibility and disconnection powers (p15–17).
Sections 10–11 deal with metering infrastructure (AMI, smart/bidirectional/generation meters) and energy accounting when meters are defective or burnt (p17–18). Sections 12–14 set online application, PPA, inspection and commissioning timelines for net/gross/net billing, leave VNM/GNM to a Commission-approved SOP, and require distribution licensees to publish procedures, agreements, service providers, incentives and installed-capacity records (p18–21).
Sections 15–18 cover general provisions (capacity tolerance, multiple units, PPA cancellation/renewal, shifting and deemed approval of standard PPAs up to 500 kW), the generic tariff methodology for solar/DSPV projects, RCO compliance and REC eligibility (p21–26). Sections 19–24 and the final interpretation clause provide powers to issue directions, relax, amend and remove difficulties, dispute resolution, repeal of the 2016 SRTPV Regulations with savings, and final Commission interpretation (p26–27).
Read with this
The regulation
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.