Framework for Resource Adequacy Regulations, 2026

Chhattisgarh State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2026

RegulationDated 18 Mar 2026No. 121/CSERC/2026 dated the 18th March 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software, from pages 1 to 34 of 40. Check the regulator's original before you rely on it.

These are the Chhattisgarh State Electricity Regulatory Commission's (Framework for Resource Adequacy) Regulations, 2026, notified as No. 121/CSERC/2026 from Raipur on 18 March 2026 and made under sections 181, 61, 66 and 86 of the Electricity Act, 2003. They extend to the whole of Chhattisgarh and come into force from publication in the Chhattisgarh Rajpatra. The objective is a planning mechanism — demand forecasting, generation resource planning, procurement planning, and monitoring — that reliably meets projected demand with an optimum generation mix (p5).

Chapter 1 (pp2–4) sets title, extent, commencement, objective, scope and the defined vocabulary of resource adequacy. Chapter 2 (p5) lays down the four-step framework and provides that the exercise is prepared for a rolling 10-year period, with LT-DRAP and MT-DRAP prepared by distribution licensees and ST-DRAP by SLDC. Chapter 3 (pp5–8) governs demand assessment and forecasting: methods discoms may use, mandated adjustments for DSM, open access, EVs, agricultural solarisation and policy drivers, scenario building, and the annual aggregation of forecasts by SLDC for State, CEA, NLDC and RLDC. Chapter 4 (pp8–13) is the core: preparation of the generation resource plan, capacity crediting of renewables (net-load based), thermal, hydro and storage resources, assessment of planning reserve margin through reliability indices, determination of the Resource Adequacy Requirement and its allocation by SLDC, and the contract-mix and tie-up obligations discoms must demonstrate to the Commission.

Chapter 5 (pp13–16) covers procurement planning — optimal least-cost resource mix, tenure and regional preference, capacity sharing, prior Commission approval for new tie-ups and PPAs/PSAs, and the exemptions permitting additional procurement during the year. Chapter 6 (p16) is a short compliance clause with non-compliance charges. Chapter 7 (pp16–18) specifies the data-sharing protocol and a detailed annual calendar of submission, validation and approval deadlines. Chapter 8 (pp19–20) requires website disclosure of procurement and merit-order data, establishment of planning and real-time procurement cells, consultation during plan preparation, and confers powers on the Commission to issue orders and practice directions, relax provisions, remove difficulties, amend the regulations, and savings clauses.

Annexure I (pp21–22) sets the modelling methodology and the constraints to be simulated; Annexure II (p23) gives the RAR summation formula; Annexure III (p24 onwards) is the set of 13 reporting formats, of which Formats 1–8 (pp25–34) are supplied — demand forecast, monthly ex-bus requirement, power supply projections, peak demand and availability, existing and planned capacity, and month-wise energy availability.

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Energy storage deployment

Read with this

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.