Skip to content

CSERC · Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh Framework for Resource Adequacy Regulations, 2024 — Draft

Chhattisgarh State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024

Draft regulationDated 4 Sep 2024No. D-20/CSERC/2024 dated --/09/2024

Draft

A proposal that has since been finalised as the Framework for Resource Adequacy Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Chhattisgarh State Electricity Regulatory Commission's draft Framework for Resource Adequacy Regulations, 2024, issued from Raipur under No. D-20/CSERC/2024 in September 2024 and made under section 181 read with sections 61, 66 and 86 of the Electricity Act, 2003 (p1). They extend to the whole of Chhattisgarh and bind generating companies, distribution licensees, the State Load Despatch Centre, transmission companies and other grid-connected entities (p1-2). Commencement is deferred — the regulations take effect on a date the Commission notifies separately, which is not printed (p1).

Chapters 1 and 2 set the objective, the definitions and the shape of the framework: resource adequacy is to be delivered through four steps — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — over a ten-year rolling planning period, with each distribution licensee preparing long-, medium- and short-term distribution resource adequacy plans (p5).

Chapter 3 governs demand assessment and forecasting. It requires licensees to follow CEA long- and medium-term forecast guidelines, lists permissible forecasting methods (trend/CAGR, end-use, ARIMA, AI/machine learning, econometric modelling), specifies the data and impact factors to be modelled (DSM, open access, distributed energy resources, EVs, ToD tariffs, agricultural and seasonal load, policy drivers) and requires at least three demand scenarios (p6-8). Short-term hourly forecasting, load research, and the aggregation chain — licensees to SLDC, SLDC to CEA, NLDC and RLDC — are set out with annual submission dates (p8-9, p22).

Chapter 4 is the analytical core: capacity crediting of contracted resources (a net-load-based approach for RE, water availability for hydro, coal availability and outages for thermal, a top-net-load-hours approach for storage), determination of the planning reserve margin from reliability indices prescribed by the Authority, computation of the resource adequacy requirement and its allocation by SLDC, and prescribed bands for long-, medium- and short-term contracts within the RAR (p10-16). It also lays out the DRAP preparation, CEA validation and Commission approval sequence, and the tie-up demonstration each licensee must make (p15).

Chapter 5 covers procurement planning: least-cost optimisation of the resource mix, tenure and type of procurement, capacity sharing inside and outside the State, prior Commission approval for new power purchase agreements, and the narrow exemptions under which additional or emergency procurement and banking may proceed without prior approval (p17-20). Chapter 6 makes RAR compliance enforceable through non-compliance charges (p21). Chapter 7 sets the data-sharing protocol and the annual timeline calendar (p21-23), and Chapter 8 the miscellaneous housekeeping — website disclosure of procurement and merit order dispatch, dedicated planning and real-time trading cells, consultation in plan preparation, and the Commission's powers to issue orders and practice directions, relax provisions, remove difficulties and amend (p24-25).

Annexure-I supplies the modelling methodology and the constraint set for the resource adequacy plan (p26-28), and Annexure-III supplies the reporting formats — demand forecasts, supply position, peak availability, plant-wise capacity and energy availability, RPO plan and forecast-deviation statements (p30-48).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Energy storage deployment

Read with this

The regulation

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document