Skip to content

NERC · Nagaland Electricity Regulatory Commission

Road Map for Reduction of Surcharge and Cross Subsidies Regulations, 2012

Nagaland Electricity Regulatory Commission (Road map for reduction of surcharge and cross subsidies) Regulations, 2012

PlanDate not statedNo.NERC/REGN/2012 dated the th Dec., 2012

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The notification makes the NERC (Road map for reduction of surcharge and cross subsidies) Regulations, 2012, under the Electricity Act 2003. It is a framework instrument for Nagaland: it does not itself set the cross-subsidy reduction milestones, but directs the Commission to notify a road map and lays down the principles for doing so (p6–7). Chapter 1 gives the short title and commencement from Gazette publication (p1–2). Chapter 2 defines key terms — integrated utility, distribution licensee, subsidising and subsidised consumer categories, cross subsidy and cost of supply (p2–3). Chapter 3 first quotes the Act and the Ministry of Power Tariff Policy 2006 to set the policy backdrop, including the Tariff Policy target that tariffs be within +20% of average cost by end-2010-11 and special support for BPL consumers (p4–6). It then requires a road map with intermediate milestones, whose period the Commission determines, and may be revised if assumptions change (p6–7). Sections 5–7 set the general method: average tariff and average cost of supply, cross-subsidy ratios, a five-year average-cost-of-supply phase followed by category-differentiated cost, accounting separation by the distribution licensee, identification of subsidised categories and consumption limits, and consideration of tariff shocks, direct subsidy, consumer mix and alternate supply (p7–11). Chapter 4 gives the Commission powers to deviate, amend and remove difficulties (p11–12).

Standard name
Tariff Regulations
Primary topics
Subsidy and cross-subsidy, Cost of supply and cost allocation, Tariff determination

Read with this

Proposed changes (drafts with no final yet)

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document