NERC · Nagaland Electricity Regulatory Commission
Road Map for Reduction of Surcharge and Cross Subsidies Regulations, 2012
Nagaland Electricity Regulatory Commission (Road map for reduction of surcharge and cross subsidies) Regulations, 2012
PlanDate not statedNo.NERC/REGN/2012 dated the th Dec., 2012
Summary
Summary written by software. Check the regulator's original before you rely on it.
The notification makes the NERC (Road map for reduction of surcharge and cross subsidies) Regulations, 2012, under the Electricity Act 2003. It is a framework instrument for Nagaland: it does not itself set the cross-subsidy reduction milestones, but directs the Commission to notify a road map and lays down the principles for doing so (p6–7). Chapter 1 gives the short title and commencement from Gazette publication (p1–2). Chapter 2 defines key terms — integrated utility, distribution licensee, subsidising and subsidised consumer categories, cross subsidy and cost of supply (p2–3). Chapter 3 first quotes the Act and the Ministry of Power Tariff Policy 2006 to set the policy backdrop, including the Tariff Policy target that tariffs be within +20% of average cost by end-2010-11 and special support for BPL consumers (p4–6). It then requires a road map with intermediate milestones, whose period the Commission determines, and may be revised if assumptions change (p6–7). Sections 5–7 set the general method: average tariff and average cost of supply, cross-subsidy ratios, a five-year average-cost-of-supply phase followed by category-differentiated cost, accounting separation by the distribution licensee, identification of subsidised categories and consumption limits, and consideration of tariff shocks, direct subsidy, consumer mix and alternate supply (p7–11). Chapter 4 gives the Commission powers to deviate, amend and remove difficulties (p11–12).
Read with this
Proposed changes (drafts with no final yet)
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.