Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Corrigendum to the Meghalaya State Electricity Regulatory Commission (Multi Year Tariff) (5 of 2026) Regulations 2026

CorrigendumDated 24 Nov 2026

Corrects the Multi Year Tariff (5 of 2026) Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page corrigendum issued by the Meghalaya State Electricity Regulatory Commission on 24 November 2026 under No. MSERC/MYT/2025/291 (p1). It corrects a computational error in the operation and maintenance (O&M) expense norms for the transmission licensee that were notified in sub-Regulation 5.7.5 of Regulation 5.7 of the MSERC (Multi Year Tariff) (5 of 2026) Regulations, 2026 (p1).

The corrigendum opens by reciting the parent regulation (Notification No. MSERC/MYT/2025/147 dated 31 July 2026), reproduces the table of normative O&M expenses as originally approved, and records the Commission's observation that the figures in INR Lakh/Bay, INR Lakh/ckt km and INR Lakh/MVA were wrongly computed and have therefore been reviewed (p1).

It then reproduces Regulation 8.4 of the parent regulation, which lets the Commission issue suo-moto orders and practice directions for effective implementation, and relies on that provision to issue the correction (p2). The operative part substitutes a corrected version of the Regulation 5.7.5 table, giving year-wise transmission O&M norms by voltage level (400 kV, 220 kV, 132 kV) for bays, single/double/multi-circuit lines and MVA, spanning FY 2027-28 to FY 2031-32 (p2). The corrected figures are of a wholly different order of magnitude from those first notified, confirming the error was one of computation rather than of approach (p1–2). It is signed by the Chairman and states no separate effective date (p2).

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft not held as English text.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document