MSERC · Meghalaya State Electricity Regulatory Commission
Meghalaya Multi Year Tariff Regulations, 2026 — Draft
Meghalaya State Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2026
Draft regulationDated 25 May 2026
Draft
A proposal that has since been finalised as the Multi Year Tariff (5 of 2026) Regulations, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Meghalaya State Electricity Regulatory Commission has issued a draft Multi-Year Tariff regulation, dated 25 May 2026, to replace its 2014 MYT framework (p1–2). It extends to the whole State and applies to all existing and future generating companies, transmission licensees, the State Load Despatch Centre and distribution licensees and their successors (p2). It comes into force on Gazette publication and applies to tariff determination from 1 April 2027; the first control period runs 2027-28 to 2029-30, with rolling three-year blocks thereafter (p2, p9, p21). Review and truing up for earlier years stays under the 2014 regulations, and tariff orders under the repealed regulations are also trued up under them (p2, p179). Renewable energy is excluded and left to separate regulations (p18).
Chapter 1 defines the terms used across the framework and sets the scope: generation supply to distribution licensees, intra-state transmission and SLDC charges, intra-state wheeling, retail supply, and open-access-related charges (p17–18).
Chapter 2 is the MYT machinery: business plan, control period, ARR forecast, annual tariff determination, mid-term review, truing up, classification of controllable and uncontrollable factors, pass-through and sharing of gains/losses, filing timelines, public hearing, tariff orders, review, subsidy treatment and the annual amendment rule (p19–44). It also says O&M expenses are not trued up, except for specified extraordinary items (p32).
Chapter 3 sets the financial principles for all regulated businesses: debt-equity ratio, capital cost and capital structure, additional capitalisation inside and beyond original scope, de-capitalisation, IDC and IEDC, consumer contributions and grants, O&M expense escalation, return on equity, incentive and penalty frameworks, interest on loans and working capital, depreciation, income tax, rebates, delayed payment surcharge, foreign exchange variation and income from other business (p45–82).
Chapter 4 covers generation tariff. Part A deals with thermal stations — petitions, tariff components, monthly capacity charge and energy charge formulas including peak/off-peak and supplementary charges for emission control systems, renovation and modernisation, a special allowance option, and normative operating parameters such as NAPAF, gross station heat rate, secondary fuel oil consumption and auxiliary consumption (p87–102). Part B deals with hydro stations — capital cost, R&M, tariff components, O&M norms for existing and new stations, capacity and energy charge computation, NAPAF, auxiliary consumption, transformation losses, incentives for early commissioning, DSM, scheduling, metering, statutory charges and rebate (p102–114).
Chapter 5 sets the transmission tariff framework: annual transmission charges, business plan and capital investment plan, R&M, O&M norms, norms of operation and target availability, incentive and penalty, sharing of transmission charges among beneficiaries, treatment of transmission losses, monthly billing formula, and billing (p115–124).
Chapter 6 covers distribution business. It requires separation of wheeling and retail supply accounts, with an allocation matrix if separation is not possible; prescribes the business plan, capital investment plan, power procurement plan and PPA approval process; short-term procurement conditions; banking and sale of surplus power with an incentive; tariff application contents; demand-side management and energy efficiency; sales estimation; distribution loss and AT&C loss trajectories and incentive/penalty formula; energy requirement; power purchase cost; transmission/wheeling and SLDC/DSM charges; the FPPPA mechanism; return on equity, interest, O&M, bad debts, non-tariff income and other business income; wheeling charges; cross-subsidy surcharge and additional surcharge methodology; revenue gap and subsidy; performance standards; retail tariff design, demand/fixed charges, energy and wheeling charges, ToD tariff, load factor and power factor treatment; and smart/prepaid metering rollout (p125–167).
Chapter 7 deals with the SLDC business: capital investment plan, petition for SLDC charges, levy and collection from generating companies, licensees and LTOA/MTOA beneficiaries, O&M expenses, non-tariff income, RLDC/NERPC/ULDC/SCADA charges, the Load Despatch Centre Development Fund, allocation of charges and monthly billing (p168–177).
Chapter 8 contains miscellaneous powers — removal of difficulties, relaxation, interpretation, suo motu orders and practice directions, review of regulations after three years, and repeal and savings for the 2014 MYT Regulations (p178–179).
Read with this
The regulation
- Dated 31 Jul 2026Multi Year Tariff (5 of 2026) Regulations, 2026
Amendments and corrections
Commencement notices and reasons
Earlier drafts
- Dated 25 May 2026Public notice: Public Notice — Draft Multi Year Tariff Regulations, 2026
- Dated 15 Jun 2026Notice extending the date for comments: Draft Multi Year Tariff Regulations, 2026 — Public Notice Extending Comment Deadline
- Dated 24 Jun 2026Hearing notice: Multi Year Tariff Regulations, 2026 — Hearing Notice
2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft not held as English text.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.