TNERC · Tamil Nadu Electricity Regulatory Commission
Intra-State Transmission / Distribution Tariff (MYT Framework) Regulations, 2009 — Amendment, 2012 — Draft
(Amendment to Tamil Nadu Electricity Regulatory Commission Terms and conditions for determination of tariff for intra state transmission / distribution of electricity under MYT framework Regulations , 2009
Draft amendmentDated 12 Oct 2012TNERC/MYT / 18 / 3 dated 12 -10-2012
Draft
A proposal that has since been finalised as the Terms and Conditions for Determination of Tariff for Transmission and Distribution under MYT Framework Regulations, 2009 — Amendment, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page TNERC consultation draft, dated 12 October 2012, proposing one change to the Commission's 2009 regulations governing tariffs for intra-state transmission and distribution under the multi-year tariff (MYT) framework.
Page 1 is the notice. The draft is published, as section 181(3) of the Electricity Act 2003 requires, for the information of all persons likely to be affected. Objections or suggestions must reach the Secretary at the Commission's Chennai address, in duplicate, on or before 29 October 2012 (p1); the Commission says it will take the draft into consideration on or after fifteen days from the date the notice is published on the TNERC website (p1).
Page 2 contains the whole of the proposed text: in Regulation 3, item (i) is to be replaced so that the control period under the MYT framework runs for 3 years, with the year preceding the first year of the control period serving as the base year (p2). No other provision of the 2009 regulations is touched.
For an analyst, the document's value is narrow but clear: it fixes the length of the MYT control period and defines the base year by reference to it. Because it is a draft, it records only what the Commission proposed in October 2012 and the consultation window it opened — not an amendment in force.
Read with this
The regulation
Amendments and corrections
Earlier drafts
- Dated 24 Dec 2010Tamil Nadu Electricity Supply Code, 2010 — Amendment — Draft
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.