Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff for Transmission and Distribution under MYT Framework Regulations, 2009 — Amendment, 2022

Amendment to TNERC (Terms and Conditions for Determination ot Tariff for Transmission / Distribution of Electricity under MYT framework) Regulations, 2009.

AmendmentDated 5 Sep 2022Notification No. TNERCTMYT/i84 dated 05'09'2022

Amends the Intra-state Transmission and Distribution Tariff under MYT Framework Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short amendment by the Tamil Nadu Electricity Regulatory Commission to its 2009 regulations governing how transmission and distribution tariffs are determined under the Multi-Year Tariff (MYT) framework. Issued as Notification No. TNERC TMYT/184 dated 05.09.2022 (p1), it rewrites only item (i) of Regulation 3 — the control period — leaving the rest of the 2009 regulations untouched.

The amended provision lengthens the control period under the MYT framework from three years to five years, extendable by the Commission, and retains the existing convention that the year preceding the first year of the control period is the base year (p1–2). Its substantive addition is a discretionary power: where the Commission desires to fix a multi-year tariff, it may prescribe a formula based on the Consumers' Price Index or the Wholesale Price Index, or alternatively a quantum — expressed as a percentage or value — required to meet the licensee's Aggregate Revenue Requirement (p1–2).

The new text also builds in a mid-course correction: during the control period, if required, the Commission shall undertake a Mid-term Review and may modify the approval for the remaining control period on the basis of true-up and/or actual performance (p1–2).

A second page reproduces the old and new wording side by side in English, with a Tamil equivalent following (p2–3), so a reader can see exactly what changed. The Explanatory Statement on page 1 says the change aligns the TNERC framework with the Model Tariff Regulations of the Forum of Regulators and with other State Electricity Regulatory Commissions, and enables formula-based multi-year tariffs with a Mid-term Review driven by true-up and actual performance.

The amendment is made under section 61 read with section 181 of the Electricity Act 2003, after prior publication of the draft under section 181(3), and takes effect from the date of publication in the Tamil Nadu Government Gazette Extraordinary — the Gazette date itself is not printed (p1).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document