Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Terms and Conditions for Open Access Regulations, 2004

Rajasthan Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2004

Consolidated copyDated 26 May 2004No. RERC/Reg. No. 25 dated 26th May 2004

Replaced by Terms and Conditions for Open Access Regulations, 2016

See that regulation for the date it took effect and for anything it keeps in force.

A consolidated copy of a regulation Voltaic does not hold, published by RERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Rajasthan Electricity Regulatory Commission issued these principal open-access regulations on 26 May 2004 under s.42 read with s.181 of the Electricity Act, 2003 (p1). They apply to intra-state transmission and/or distribution systems, including use alongside inter-state transmission (p1). Regulations 1–3 cover title, commencement on Gazette publication and extent of application; Regulation 4 makes licensees, generating companies, captive generators and consumers eligible, subject to payment of Commission-determined charges and to ineligibility for insolvency, bankruptcy or dues exceeding two months of billing (p1–2). Regulations 5–6 protect existing distribution licensees and existing consumers/generators, requiring them to report system-use details to the STU and SLDC within 60 days (p2). Regulation 7 classifies short-term and long-term customers and defers sub-one-year open access; Regulation 8 sets allotment priority; Regulation 9 sets capacity-assessment criteria and network-capacity assumptions (p2–4). Regulations 10–13 lay down application procedures, fees, agreements and non-utilisation surrender/reduction (p4–6). Regulations 14–16 specify transmission/wheeling charges, cross-subsidy surcharge and additional surcharge principles (p6–7). Regulations 17–23 cover metering, communication, scheduling and system operation charges, UI pricing, reactive energy, energy losses and commercial security (p7–9). Regulations 24–25 require grid discipline and direct collection/disbursement of charges (p9). Regulation 26 phases consumer open access and allows state-policy captive/non-conventional cases. Regulations 27–30 set curtailment priority, SLDC information-posting, a three-tier grievance mechanism and Commission powers to remove difficulties (p10–11).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Metering

Read with this

Voltaic does not hold the regulation itself.

Amendments and corrections

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document