RERC · Rajasthan Electricity Regulatory Commission
Terms and Conditions for Open Access Regulations, 2004
Rajasthan Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2004
Consolidated copyDated 26 May 2004No. RERC/Reg. No. 25 dated 26th May 2004
Replaced by Terms and Conditions for Open Access Regulations, 2016
See that regulation for the date it took effect and for anything it keeps in force.
A consolidated copy of a regulation Voltaic does not hold, published by RERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Rajasthan Electricity Regulatory Commission issued these principal open-access regulations on 26 May 2004 under s.42 read with s.181 of the Electricity Act, 2003 (p1). They apply to intra-state transmission and/or distribution systems, including use alongside inter-state transmission (p1). Regulations 1–3 cover title, commencement on Gazette publication and extent of application; Regulation 4 makes licensees, generating companies, captive generators and consumers eligible, subject to payment of Commission-determined charges and to ineligibility for insolvency, bankruptcy or dues exceeding two months of billing (p1–2). Regulations 5–6 protect existing distribution licensees and existing consumers/generators, requiring them to report system-use details to the STU and SLDC within 60 days (p2). Regulation 7 classifies short-term and long-term customers and defers sub-one-year open access; Regulation 8 sets allotment priority; Regulation 9 sets capacity-assessment criteria and network-capacity assumptions (p2–4). Regulations 10–13 lay down application procedures, fees, agreements and non-utilisation surrender/reduction (p4–6). Regulations 14–16 specify transmission/wheeling charges, cross-subsidy surcharge and additional surcharge principles (p6–7). Regulations 17–23 cover metering, communication, scheduling and system operation charges, UI pricing, reactive energy, energy losses and commercial security (p7–9). Regulations 24–25 require grid discipline and direct collection/disbursement of charges (p9). Regulation 26 phases consumer open access and allows state-policy captive/non-conventional cases. Regulations 27–30 set curtailment priority, SLDC information-posting, a three-tier grievance mechanism and Commission powers to remove difficulties (p10–11).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.