CERC · Central Electricity Regulatory Commission
Furnishing of Technical Details by the Generating Companies Regulations, 2009
Central Electricity Regulatory Commission (Furnishing of Technical Details by the Generating Companies) Regulations, 2009
RegulationDated 14 Oct 2009No.L- 7/138/(153)/2008-CERC dated 14th October, 2009
Summary
Summary written by software. Check the regulator's original before you rely on it.
A short CERC instrument that creates a standing data-filing duty on generating companies in the Commission's jurisdiction. It runs to two operative regulations and three appended forms.
Regulation 1 names the regulations and brings them into force from the date of Gazette publication (p1). Regulation 2 is the operative obligation: every generating company that, on the commencement date, is operating or setting up a generating station of the kind described in s.79(1)(a) or (b) of the Electricity Act must file updated technical details with the Commission, separately for each stage of each station, in the applicable appended form (pp1–2). An annual cycle is set — details as on 1 April, filed with a soft copy by 30 April every year; a company intending to build a new station must file its first report at least three years ahead of the projected commercial operation date of the first unit (p2).
The appendix carries three station-type questionnaires: coal/lignite thermal (pp3–5), gas/liquid/diesel (pp6–8) and hydro (pp9–10). Each collects station identity and location, unit-wise capacity and commercial operation dates, beneficiary tie-up shares, associated transmission, equipment manufacturers, fuel particulars, steam/gas cycle parameters and cooling arrangements; the hydro form adds reservoir levels, heads, silt levels and design energy. Notes to each form permit site-specific additions, require the electronic copy, and borrow the definitions of beneficiary, installed capacity, merchant capacity, target beneficiary and design energy from other CERC instruments (pp5, 8, 10).
Read with this
Commencement notices and reasons
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.