Skip to content

CERC · Central Electricity Regulatory Commission

Furnishing of Technical Details by the Generating Companies Regulations, 2009

Central Electricity Regulatory Commission (Furnishing of Technical Details by the Generating Companies) Regulations, 2009

RegulationDated 14 Oct 2009No.L- 7/138/(153)/2008-CERC dated 14th October, 2009

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short CERC instrument that creates a standing data-filing duty on generating companies in the Commission's jurisdiction. It runs to two operative regulations and three appended forms.

Regulation 1 names the regulations and brings them into force from the date of Gazette publication (p1). Regulation 2 is the operative obligation: every generating company that, on the commencement date, is operating or setting up a generating station of the kind described in s.79(1)(a) or (b) of the Electricity Act must file updated technical details with the Commission, separately for each stage of each station, in the applicable appended form (pp1–2). An annual cycle is set — details as on 1 April, filed with a soft copy by 30 April every year; a company intending to build a new station must file its first report at least three years ahead of the projected commercial operation date of the first unit (p2).

The appendix carries three station-type questionnaires: coal/lignite thermal (pp3–5), gas/liquid/diesel (pp6–8) and hydro (pp9–10). Each collects station identity and location, unit-wise capacity and commercial operation dates, beneficiary tie-up shares, associated transmission, equipment manufacturers, fuel particulars, steam/gas cycle parameters and cooling arrangements; the hydro form adds reservoir levels, heads, silt levels and design energy. Notes to each form permit site-specific additions, require the electronic copy, and borrow the definitions of beneficiary, installed capacity, merchant capacity, target beneficiary and design energy from other CERC instruments (pp5, 8, 10).

Standard name
Compliance Audit and Furnishing of Information
Primary topics
Compliance and reporting

Read with this

Commencement notices and reasons

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document