MSERC · Meghalaya State Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
Meghalaya State Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018
RegulationDated 31 Oct 2018MSERC/REGULATIONS/F&S/2018/02 dated 31stOctober 2018
A later regulation on Voltaic changes some of its provisions: Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are the Meghalaya State Electricity Regulatory Commission's principal regulations for forecasting, scheduling and deviation settlement for solar and wind generation, issued on 31 October 2018 under the Electricity Act, 2003 (p1). They apply to wind and solar generators connected to the intra-state transmission system, including through pooling sub-stations and for self-consumption or sale within or outside Meghalaya; the combined installed capacity at a pooling sub-station, or of an individual generator connected to another sub-station, must be not less than 1 MW (p4). They commence on publication in the Official Gazette, but the Commercial Arrangements and related deviation-charge and penalty provisions commence six months later; the Gazette date is not printed (p1). The Commission is to review the regulations after two years or earlier (p4).
Part A states the objective of facilitating grid integration of wind and solar while maintaining grid security, and sets out applicability (p3–4). Part B establishes the Forecasting and Scheduling Code: generators at a pooling sub-station must appoint a Qualified Co-ordinating Agency (QCA), which is registered with the SLDC, becomes the single point of contact, aggregates forecasts and schedules, handles de-pooling and settlement, and may be penalised or deregistered for gaming (p4–7). It provides for Day-Ahead, Week-Ahead and intra-Day scheduling, revisions, SLDC forecasting, a Detailed Procedure to be submitted by SLDC, and treatment of intentional mis-declaration (p4–7).
Part C contains the Commercial Arrangements. It separates intra-state deviation settlement, which uses the regulation's own deviation-charge table, from inter-state transactions, for which CERC DSM Regulations apply at the inter-state level while state-level deviation is settled through the State DSM Pool (p8–10). Part D covers implementation: metering, energy accounting, communication between QCA and SLDC, deviation accounting methodology, payment mechanism and security, curtailment intimation, weekly accounts, and de-pooling of deviation charges to individual generators (p10–13). Part E gives the Commission powers to amend, remove difficulties, relax provisions and issue practice directions (p13). The Annexure sets the framework for deviation charges for generators selling or consuming power outside Meghalaya, including fixed-rate PPA/APPC treatment and Renewable Energy Certificate netting for RPO balancing (p15–16).
Read with this
Amendments and corrections
- Dated 27 Oct 2025Changes some provisions: Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.