Terms and Conditions for Determination of Transmission Tariff Regulations, 2014

Odisha Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2014

RegulationDated 21 Oct 2014Published in the Gazette 4 Dec 2014No. 1432—OERC-RA-AMEND.-REGU.—8/2013-Vol.-III dated The 21st October, 2014

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the OERC's principal multi-year tariff regulation for intra-State transmission in Odisha. It was notified on 21 October 2014 and published in the Odisha Gazette on 4 December 2014, when it came into force (p1). Made under ss.61, 62 and 86 read with s.181 of the Electricity Act 2003, it extends to the whole State and supersedes the OERC (Terms & Conditions for Determination of Tariff) Regulations, 2004 (p1). It applies to all transmission licensees in Odisha, with distribution licensees necessarily treated as long-term transmission customers (p2, p7). It does not apply where tariff is determined through central-government-guided bidding under s.63; such tariff is adopted (p1, p7).

Chapters 1–3 cover commencement, definitions and scope (pp1–7). Chapter 4 requires a long-term business plan for the control period and lays down what capital investment plans, additional capitalisation, renovation and modernisation proposals and transmission-loss targets must contain and how they are approved (pp7–12). Chapter 5 sets the application and annual ARR filing procedure, information requirements, fees, provisional tariff and the Commission's suo motu power (pp12–13). Chapter 6 states the guiding principles: separation of transmission and SLDC functions, baselines, controllable versus uncontrollable costs, the normative availability norm and the transmission tariff formula, including reactive energy charges and availability incentive (pp13–15). Chapter 7 provides for annual truing up against audited accounts and for creating regulatory assets for uncontrollable cost variations (pp15–16). Chapter 8 is the core ARR methodology, covering O&M and employee costs, A&G, repairs and maintenance, interest and finance charges, working capital, return on equity, depreciation, non-tariff income, income from other business, income tax, profit sharing, CDM benefit sharing, fees, late payment surcharge and rebates, quality-of-supply monitoring, metering and foreign-exchange variation recovery (pp16–24). Chapter 9 gives the Commission powers to remove difficulties, relax, amend, interpret and depart from procedure (p25). Appendix A gives asset-wise depreciation rates (pp26–27); Appendix B gives the TAFY/NAFY calculation and deemed-availability rules (pp27–28).

The regulation is largely procedural and methodological; the values it sets (availability norm, escalation factors, depreciation rates, interest rates, return on equity, etc.) are inputs to tariff determination and are subject to revision and relaxations. A senior analyst should look to Chapter 4 for investment approval, Chapter 8 for cost and return treatment, and Appendix B for availability calculations.

Standard name
Transmission Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

Proposed changes (drafts with no final yet)

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗