The package is the Odisha Electricity Regulatory Commission's consultation draft of the 2026 transmission tariff regulations. A public notice (p1) says the Commission has framed the draft under s.181 of the Electricity Act, 2003, invites objections and suggestions by 30 May 2026, and will consider modifications before final publication in the official gazette. The draft notification (p2) states it is made under ss.61, 62 and 86 read with s.181, extends to Odisha, comes into force on gazette publication, and applies to transmission licensees and users of the intra-state transmission system; tariffs discovered through s.63 competitive bidding are excluded (p2–3).
Chapter 1 (p2–12) sets short title, commencement, scope and an extensive set of definitions, including Control Period, Existing Project, New Project, Beneficiary, Change in Law, Force Majeure and useful life. It defines the first Control Period as 1 April 2027 to 31 March 2029, although the same definition says control periods are ordinarily five years (p6).
Chapter 2 (p12–17) deals with transmission planning, business plans and capital investment. The STU prepares a long-term transmission plan for Commission approval; only projects in the approved plan and capital investment plan are eligible for ARR treatment (p12–13). It sets rules for investment approval, cost and time overrun, a special route for non-remunerative but essential projects through grants, VGF or normative loan, and transmission loss targets with a penalty for excess loss (p13–17).
Chapter 3 (p17–23) gives the procedure for tariff determination: annual ARR filings, contents of the tariff petition, filing fees, provisional tariff and suo motu powers (p17–18). It then sets the general approach and tariff design: capacity charges for long-term and medium-term open access customers and distribution licensees, energy-based charges for short-term open access, grid support and reactive energy charges, an availability incentive, and truing-up of capital expenditure and tariff (p18–23).
Chapter 4 (p23–44) covers capital structure and ARR. It specifies debt-equity treatment, capital cost for new and existing projects, NCLT-acquired projects, prudence check, IDC/IEDC, initial spares, additional capitalisation, renovation and modernisation, and decommissioning (p23–33). It then sets the ARR components — O&M, terminal benefits, interest and finance charges, depreciation, return on equity, non-tariff income, income from other business, income tax, profit sharing and carbon credit sharing (p34–41) — and commercial terms such as fee recovery, late payment surcharge, rebate, quality of supply, metering and foreign exchange hedging (p41–43). Miscellaneous provisions cover repeal and savings, removal of difficulties, power to relax, amend, interpretation and inherent powers (p43–44).
Appendices A–C (p45–52) provide the depreciation schedule and the procedure and formulae for calculating transmission system availability.
Read with this
The regulation
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.