TSERC · Telangana State Electricity Regulatory Commission
Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulation, 2022 — Draft
TSERC Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulation, 2022
Published with a draftDated 9 Mar 2022No.TSERC/___/2022 dated 09.03.2022
Draft
The draft has since been finalised as the Renewable Power Purchase Obligation Regulation, 2022.
Published with the Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/RECs) Regulations, 2022 — Draft — Press Release.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is TSERC's draft Renewable Power Purchase Obligation Regulation, 2022, dated 9 March 2022 and stated to come into force on 1 April 2022 (p1, p3). It is the successor to the Commission's 2018 RPO Regulation, whose four-year term ends 31 March 2022, and is expressly issued in draft, before finalisation (p1, p3).
The preamble (pp1–3) anchors the regulation in section 86(1)(e) of the Electricity Act, 2003 and quotes the National Tariff Policy, 2016 on minimum RPO percentages, the solar trajectory to March 2022, mandatory 100% procurement from waste-to-energy plants, the REC mechanism, and technology- and vintage-based REC multipliers.
Clause 1 gives the short title, territorial application across Telangana and the commencement date (p3). Clause 2 defines the vocabulary — obligated entity, captive user, RPPO, State Agency, Central Agency, REC, floor and forbearance price, pooled cost of power purchase, hybrid and storage-linked RE projects (pp3–6).
Clause 3 is the operative core: it sets the annual Solar, Non-solar and total RPPO trajectory for FY 2022-23 to FY 2026-27 in a table (pp6–7), with provisos on the consumption base and on netting solar and non-solar shortfalls, plus rules for rooftop solar PV counting toward a distribution licensee's RPPO, compulsory waste-to-energy procurement, bundling with coal/lignite, RESCO, continuation of existing PPAs, and the Commission's power to revise or carry forward targets (pp7–8). Clause 4 covers REC procurement, deposit with the State Agency and independent verification (pp8–9). Clause 5 identifies the obligated entities and their reporting duties (pp9–10). Clause 6 assigns State Agency functions to the SLDC and provides for its remuneration and replacement (pp10–11). Clause 7 imports CERC eligibility and registration rules and lays out the pooled cost of power purchase process (pp11–12). Clause 8 sets the consequences of default — deposit into a separate fund at the forbearance price, plus penalty under section 142 (pp12–13). Clauses 9–15 cover information disclosure, powers to amend, direct, relax and remove difficulties, savings for Regulation No. 2 of 2018, and inquiry and adjudication under the Conduct of Business Regulations, 2015 (pp13–14).
Read with this
The regulation
- Dated 1 Apr 2022Renewable Power Purchase Obligation Regulation, 2022
Commencement notices and reasons
Procedures and orders made under it
- Dated 27 Mar 2024Allowing RECs to meet RPPO across any RE technology — Approval, 2024
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.