TSERC · Telangana State Electricity Regulatory Commission
Renewable Power Purchase Obligation Regulation, 2022
Telangana State Electricity Regulatory Commission Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulation, 2022
RegulationDated 1 Apr 2022Published in the Gazette 4 Apr 2022In force from 1 Apr 2022Regulation No.7 of 2022 dated 01.04.2022
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is TSERC's fresh five-year Renewable Power Purchase Obligation regulation, notified as Regulation No.7 of 2022 and replacing the 2018 RPPO regulation whose four-year term ended on 31.03.2022 (p1–2). It appears in the Telangana Gazette of 4 April 2022 and took effect from 1 April 2022 (p1–2, p8).
The preamble grounds the regulation in s.86(1)(e) of the Electricity Act 2003 and reproduces the Tariff Policy 2016 provisions on RPOs — solar-specific percentages, compulsory 100% procurement from waste-to-energy plants, and the REC mechanism (p1–2).
Clause 1 sets title, statewide extent and commencement; clause 2 supplies the definitions, centred on who counts as an Obligated Entity and on REC and storage/hybrid concepts (p2–4). Clause 3 is the operative core: it fixes the RPPO trajectory as a percentage of electricity consumption for FY 2022-23 to FY 2026-27, split into solar and non-solar, on a base that excludes RE and large hydro consumption, allows solar/non-solar cross-compensation once compliance reaches 85%, and deals with rooftop solar net metering, RECs, waste-to-energy, RE bundled with thermal and continuation of existing PPAs (p4–5).
Clauses 4–9 cover implementation: use of CERC-issued RECs; the advance, annual and quarterly reporting duties of distribution licensees and of captive users and open access consumers; the State Agency's role, monthly publication and remuneration; certificate eligibility and the pooled cost of power purchase cycle; default consequences — deposit of the shortfall valued at the Forbearance Price plus penalty under s.142; and a public website information system (p5–8). Clauses 10–15 are the standard machinery — amendment, directions, relaxation, removal of difficulties, savings for actions under the 2018 regulation, and adjudication through the Commission's Conduct of Business Regulations, 2015 (p8).
Read with this
Commencement notices and reasons
Procedures and orders made under it
- Dated 27 Mar 2024Allowing RECs to meet RPPO across any RE technology — Approval, 2024
Earlier drafts
- Dated 9 Mar 2022Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/RECs) Regulations, 2022 — Draft — Press Release
- Dated 9 Mar 2022File: Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulation, 2022 — Draft
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.