This draft DERC notification establishes Delhi's renewable purchase obligation (RPO) and wires it into the CERC renewable energy certificate (REC) market. It is framed as a notification issued after previous publication and, once in force, extends to all areas under the Commission's jurisdiction (p1).
Regulation 2 (p1–4) defines the machinery the scheme runs on: the Act, obligated entity, open access consumer, captive user, Central Agency, State Agency, Certificate, floor and forbearance price, preferential tariff, quantum of purchase and renewable energy sources. Regulation 3 (p4) fixes who is bound — distribution licensees in the NCT of Delhi, captive users using non-renewable sources above 5 MW, and open access consumers with contract demand above 1 MW from non-renewable sources.
Regulation 4 (p4–5) is the core: a year-by-year minimum percentage of total consumption, split into a solar and a non-solar obligation, running from 2011-12 to 2016-17 (Table 1), with the solar slice meetable only from solar generation, existing Commission-consented PPAs allowed to run to their validity, and the Commission empowered to revise targets. Regulation 5 (p6) makes CERC-issued RECs the compliance instrument and maps solar and non-solar certificates onto the two obligations. Regulation 6 (pp6–7) creates the State Agency's accreditation, monitoring and reporting duties; Regulations 7 and 8 (pp7–8) set what distribution licensees, captive users and open access consumers must file, when, and with what consequence for shortfall.
Regulation 9 (pp8–9) governs the pricing choice between preferential tariff and the REC route, and exempts renewable open access from cross-subsidy surcharge while denying banking. Regulation 10 (p9) gives renewable generators open access irrespective of installed capacity. Regulation 11 (pp9–10) handles default: a ring-fenced shortfall fund, penalty under section 142, carry-forward on genuine difficulty, and no pass-through of penalties. Regulations 12 to 16 (pp10–12) provide for compliance auditors and the Commission's powers to relax, amend, remove difficulties, with savings provisions.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 30 Jun 2011Explanatory memorandum: Draft Renewable Purchase Obligation and REC Framework Implementation Regulations, 2011 — Explanatory Memorandum
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.