Skip to content

DERC · Delhi Electricity Regulatory Commission

Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation Regulations, 2011 — Draft

Delhi Electricity Regulatory Commission (Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation) Regulations, 2011

Draft regulationDated 30 Jun 2011

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This draft DERC notification establishes Delhi's renewable purchase obligation (RPO) and wires it into the CERC renewable energy certificate (REC) market. It is framed as a notification issued after previous publication and, once in force, extends to all areas under the Commission's jurisdiction (p1).

Regulation 2 (p1–4) defines the machinery the scheme runs on: the Act, obligated entity, open access consumer, captive user, Central Agency, State Agency, Certificate, floor and forbearance price, preferential tariff, quantum of purchase and renewable energy sources. Regulation 3 (p4) fixes who is bound — distribution licensees in the NCT of Delhi, captive users using non-renewable sources above 5 MW, and open access consumers with contract demand above 1 MW from non-renewable sources.

Regulation 4 (p4–5) is the core: a year-by-year minimum percentage of total consumption, split into a solar and a non-solar obligation, running from 2011-12 to 2016-17 (Table 1), with the solar slice meetable only from solar generation, existing Commission-consented PPAs allowed to run to their validity, and the Commission empowered to revise targets. Regulation 5 (p6) makes CERC-issued RECs the compliance instrument and maps solar and non-solar certificates onto the two obligations. Regulation 6 (pp6–7) creates the State Agency's accreditation, monitoring and reporting duties; Regulations 7 and 8 (pp7–8) set what distribution licensees, captive users and open access consumers must file, when, and with what consequence for shortfall.

Regulation 9 (pp8–9) governs the pricing choice between preferential tariff and the REC route, and exempts renewable open access from cross-subsidy surcharge while denying banking. Regulation 10 (p9) gives renewable generators open access irrespective of installed capacity. Regulation 11 (pp9–10) handles default: a ring-fenced shortfall fund, penalty under section 142, carry-forward on genuine difficulty, and no pass-through of penalties. Regulations 12 to 16 (pp10–12) provide for compliance auditors and the Commission's powers to relax, amend, remove difficulties, with savings provisions.

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Renewable energy tariff

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document